Timetables

P7D_PLM_GRP

Note: Timetables are subject to change; re-visit StudentWeb for the most up-to-date information.

Semester 2

Monday Tuesday Wednesday Thursday Friday Saturday Sunday
08:05 am - 04:35 pm
Week(s): 31
July: 29

Location:
  • E2.G21A (through w/shop)
  • Modules:
  • INSTALL SEWERAGE PUMPSETS:P7D_PLM

  • 08:05 am - 04:35 pm
    Week(s): 34
    August: 19

    Location:
  • E7.116 & E7.118 Classroom & Hub
  • E7.G08a
  • Modules:
  • INSTALL AND TEST SPLIT SYSTEM AIR CONDITIONING:P7D_PLM
  • POSITION, ASSEMBLE AND START UP SINGLE HEAD SPLIT AIR CONDITIONING AND WATER HEATING HEAT PUMP SYSTEMS:P7D_PLM
  • RECOVER, PRESSURE TEST, EVACUATE, CHARGE AND LEAK TEST REFRIGERANTS - SPLIT SYSTEMS:P7D_PLM

  • 08:05 am - 04:35 pm
    Week(s): 41
    October: 7

    Location:
  • E2.G21A (through w/shop)
  • Modules:
  • INSTALL LPG SYSTEMS IN CARAVANS, MOBILE HOMES AND MOBILE WORKPLACES:P7D_PLM
  • INSTALL LPG SYSTEMS IN MARINE CRAFT:P7D_PLM
  • INSTALL GAS PRESSURE CONTROL EQUIPMENT:P7D_PLM
  • INSTALL TYPE A GAS APPLIANCE FLUES:P7D_PLM
  • INSTALL TYPE B GAS APPLIANCE FLUES:P7D_PLM
  • INSTALL GAS PIPING SYSTEMS:P7D_PLM
  • INSTALL LPG STORAGE OF AGGREGATE STORAGE CAPACITY UP TO 500 LITRES:P7D_PLM

  • 08:05 am - 04:35 pm
    Week(s): 45
    November: 4

    Location:
  • E2.G21A (through w/shop)
  • Modules:
  • INSTALL MEDICAL GAS PIPELINE SYSTEMS:P7D_PLM
  • CONNECT AND INSTALL STORAGE TANKS TO A DOMESTIC WATER SUPPLY:P7D_PLM
  • FIT OFF AND COMMISSION HEATED AND COLD WATER SERVICES:P7D_PLM

  • 08:05 am - 04:35 pm
    Week(s): 49
    December: 2

    Location:
  • E2.G21A (through w/shop)
  • Modules:
  • PLAN LAYOUT OF A RESIDENTIAL SANITARY DRAINAGE SYSTEM:P7D_PLM
  • INSTALL BELOW GROUND SANITARY DRAINAGE SYSTEMS:P7D_PLM

  • 08:05 am - 04:35 pm
    Week(s): 31
    July: 30

    Location:
  • E2.G21A (through w/shop)
  • Modules:
  • INSTALL SEWERAGE PUMPSETS:P7D_PLM

  • 08:05 am - 04:35 pm
    Week(s): 41
    October: 8

    Location:
  • E2.G21A (through w/shop)
  • Modules:
  • INSTALL LPG SYSTEMS IN CARAVANS, MOBILE HOMES AND MOBILE WORKPLACES:P7D_PLM
  • INSTALL LPG SYSTEMS IN MARINE CRAFT:P7D_PLM
  • INSTALL GAS PRESSURE CONTROL EQUIPMENT:P7D_PLM
  • INSTALL TYPE A GAS APPLIANCE FLUES:P7D_PLM
  • INSTALL TYPE B GAS APPLIANCE FLUES:P7D_PLM
  • INSTALL GAS PIPING SYSTEMS:P7D_PLM
  • INSTALL LPG STORAGE OF AGGREGATE STORAGE CAPACITY UP TO 500 LITRES:P7D_PLM

  • 08:05 am - 04:35 pm
    Week(s): 49
    December: 3

    Location:
  • E2.G21A (through w/shop)
  • Modules:
  • PLAN LAYOUT OF A RESIDENTIAL SANITARY DRAINAGE SYSTEM:P7D_PLM
  • INSTALL BELOW GROUND SANITARY DRAINAGE SYSTEMS:P7D_PLM

  • 08:05 am - 04:35 pm
    Week(s): 34
    August: 20

    Location:
  • E7.120-122 Refrigeration+Hub
  • E7.G08b
  • Modules:
  • INSTALL AND TEST SPLIT SYSTEM AIR CONDITIONING:P7D_PLM
  • POSITION, ASSEMBLE AND START UP SINGLE HEAD SPLIT AIR CONDITIONING AND WATER HEATING HEAT PUMP SYSTEMS:P7D_PLM
  • RECOVER, PRESSURE TEST, EVACUATE, CHARGE AND LEAK TEST REFRIGERANTS - SPLIT SYSTEMS:P7D_PLM

  • 08:05 am - 04:35 pm
    Week(s): 31
    July: 31

    Location:
  • E2.G16 Plumbing
  • Modules:
  • INSTALL SEWERAGE PUMPSETS:P7D_PLM

  • 08:05 am - 04:35 pm
    Week(s): 41
    October: 9

    Location:
  • E2.G16 Plumbing
  • Modules:
  • INSTALL LPG SYSTEMS IN CARAVANS, MOBILE HOMES AND MOBILE WORKPLACES:P7D_PLM
  • INSTALL LPG SYSTEMS IN MARINE CRAFT:P7D_PLM
  • INSTALL GAS PRESSURE CONTROL EQUIPMENT:P7D_PLM
  • INSTALL TYPE A GAS APPLIANCE FLUES:P7D_PLM
  • INSTALL TYPE B GAS APPLIANCE FLUES:P7D_PLM
  • INSTALL GAS PIPING SYSTEMS:P7D_PLM
  • INSTALL LPG STORAGE OF AGGREGATE STORAGE CAPACITY UP TO 500 LITRES:P7D_PLM

  • 08:05 am - 04:35 pm
    Week(s): 45
    November: 6

    Location:
  • E2.G16 Plumbing
  • Modules:
  • INSTALL MEDICAL GAS PIPELINE SYSTEMS:P7D_PLM
  • CONNECT AND INSTALL STORAGE TANKS TO A DOMESTIC WATER SUPPLY:P7D_PLM
  • FIT OFF AND COMMISSION HEATED AND COLD WATER SERVICES:P7D_PLM

  • 08:05 am - 04:35 pm
    Week(s): 49
    December: 4

    Location:
  • E2.G16 Plumbing
  • Modules:
  • PLAN LAYOUT OF A RESIDENTIAL SANITARY DRAINAGE SYSTEM:P7D_PLM
  • INSTALL BELOW GROUND SANITARY DRAINAGE SYSTEMS:P7D_PLM

  • 08:05 am - 04:35 pm
    Week(s): 34
    August: 21

    Location:
  • E2.G16 Plumbing
  • Modules:
  • INSTALL AND TEST SPLIT SYSTEM AIR CONDITIONING:P7D_PLM
  • POSITION, ASSEMBLE AND START UP SINGLE HEAD SPLIT AIR CONDITIONING AND WATER HEATING HEAT PUMP SYSTEMS:P7D_PLM
  • RECOVER, PRESSURE TEST, EVACUATE, CHARGE AND LEAK TEST REFRIGERANTS - SPLIT SYSTEMS:P7D_PLM

  • 08:05 am - 04:35 pm
    Week(s): 31
    July: 32

    Location:
  • E2.G21A (through w/shop)
  • Modules:
  • INSTALL SEWERAGE PUMPSETS:P7D_PLM

  • 08:05 am - 04:35 pm
    Week(s): 41
    October: 10

    Location:
  • E2.G21A (through w/shop)
  • Modules:
  • INSTALL LPG SYSTEMS IN CARAVANS, MOBILE HOMES AND MOBILE WORKPLACES:P7D_PLM
  • INSTALL LPG SYSTEMS IN MARINE CRAFT:P7D_PLM
  • INSTALL GAS PRESSURE CONTROL EQUIPMENT:P7D_PLM
  • INSTALL TYPE A GAS APPLIANCE FLUES:P7D_PLM
  • INSTALL TYPE B GAS APPLIANCE FLUES:P7D_PLM
  • INSTALL GAS PIPING SYSTEMS:P7D_PLM
  • INSTALL LPG STORAGE OF AGGREGATE STORAGE CAPACITY UP TO 500 LITRES:P7D_PLM

  • 08:05 am - 04:35 pm
    Week(s): 45
    November: 7

    Location:
  • E2.G21A (through w/shop)
  • Modules:
  • INSTALL MEDICAL GAS PIPELINE SYSTEMS:P7D_PLM
  • CONNECT AND INSTALL STORAGE TANKS TO A DOMESTIC WATER SUPPLY:P7D_PLM
  • FIT OFF AND COMMISSION HEATED AND COLD WATER SERVICES:P7D_PLM

  • 08:05 am - 04:35 pm
    Week(s): 49
    December: 5

    Location:
  • E2.G21A (through w/shop)
  • Modules:
  • PLAN LAYOUT OF A RESIDENTIAL SANITARY DRAINAGE SYSTEM:P7D_PLM
  • INSTALL BELOW GROUND SANITARY DRAINAGE SYSTEMS:P7D_PLM

  • 08:05 am - 04:35 pm
    Week(s): 34
    August: 22

    Location:
  • E7.116 & E7.118 Classroom & Hub
  • E7.G08a
  • Modules:
  • INSTALL AND TEST SPLIT SYSTEM AIR CONDITIONING:P7D_PLM
  • POSITION, ASSEMBLE AND START UP SINGLE HEAD SPLIT AIR CONDITIONING AND WATER HEATING HEAT PUMP SYSTEMS:P7D_PLM
  • RECOVER, PRESSURE TEST, EVACUATE, CHARGE AND LEAK TEST REFRIGERANTS - SPLIT SYSTEMS:P7D_PLM

  • 08:05 am - 04:35 pm
    Week(s): 31
    July: 33

    Location:
  • E2.G21A (through w/shop)
  • Modules:
  • INSTALL SEWERAGE PUMPSETS:P7D_PLM

  • 08:05 am - 04:35 pm
    Week(s): 41
    October: 11

    Location:
  • E2.G21A (through w/shop)
  • Modules:
  • INSTALL LPG SYSTEMS IN CARAVANS, MOBILE HOMES AND MOBILE WORKPLACES:P7D_PLM
  • INSTALL LPG SYSTEMS IN MARINE CRAFT:P7D_PLM
  • INSTALL GAS PRESSURE CONTROL EQUIPMENT:P7D_PLM
  • INSTALL TYPE A GAS APPLIANCE FLUES:P7D_PLM
  • INSTALL TYPE B GAS APPLIANCE FLUES:P7D_PLM
  • INSTALL GAS PIPING SYSTEMS:P7D_PLM
  • INSTALL LPG STORAGE OF AGGREGATE STORAGE CAPACITY UP TO 500 LITRES:P7D_PLM

  • 08:05 am - 04:35 pm
    Week(s): 45
    November: 8

    Location:
  • E2.G21A (through w/shop)
  • Modules:
  • INSTALL MEDICAL GAS PIPELINE SYSTEMS:P7D_PLM
  • CONNECT AND INSTALL STORAGE TANKS TO A DOMESTIC WATER SUPPLY:P7D_PLM
  • FIT OFF AND COMMISSION HEATED AND COLD WATER SERVICES:P7D_PLM

  • 08:05 am - 04:35 pm
    Week(s): 49
    December: 6

    Location:
  • E2.G21A (through w/shop)
  • Modules:
  • PLAN LAYOUT OF A RESIDENTIAL SANITARY DRAINAGE SYSTEM:P7D_PLM
  • INSTALL BELOW GROUND SANITARY DRAINAGE SYSTEMS:P7D_PLM

  • 08:05 am - 04:35 pm
    Week(s): 34
    August: 23

    Location:
  • E7.116 & E7.118 Classroom & Hub
  • E7.G08a
  • Modules:
  • INSTALL AND TEST SPLIT SYSTEM AIR CONDITIONING:P7D_PLM
  • POSITION, ASSEMBLE AND START UP SINGLE HEAD SPLIT AIR CONDITIONING AND WATER HEATING HEAT PUMP SYSTEMS:P7D_PLM
  • RECOVER, PRESSURE TEST, EVACUATE, CHARGE AND LEAK TEST REFRIGERANTS - SPLIT SYSTEMS:P7D_PLM