Timetables

P8A_PLM_GRP

Note: Timetables are subject to change; re-visit StudentWeb for the most up-to-date information.

Semester 2

Monday Tuesday Wednesday Thursday Friday Saturday Sunday
08:05 am - 04:35 pm
Week(s): 28
July: 8

Location:
  • E2.M10 (through w/shop)
  • Modules:
  • LOCATE AND CLEAR BLOCKAGES:P8A_PLM
  • INSTALL DOMESTIC TREATMENT PLANTS:P8A_PLM
  • MAINTAIN EFFLUENT DISINFECTION SYSTEMS:P8A_PLM
  • INSTALL ON-SITE DISPOSAL SYSTEMS:P8A_PLM

  • 08:05 am - 04:35 pm
    Week(s): 32
    August: 5

    Location:
  • E2.M10 (through w/shop)
  • Modules:
  • INSTALL AND COMMISSION WATER HEATING SYSTEMS:P8A_PLM

  • 08:05 am - 04:35 pm
    Week(s): 36
    September: 2

    Location:
  • E2.M10 (through w/shop)
  • Modules:
  • COLLECT AND STORE ROOF WATER:P8A_PLM
  • INSTALL WATER PUMPSETS:P8A_PLM

  • 08:05 am - 04:35 pm
    Week(s): 42
    October: 14

    Location:
  • E7.115 Elec. Tech. Classroom
  • E7.G08b
  • Modules:
  • INSTALL AND TEST SPLIT SYSTEM AIR CONDITIONING:P8A_PLM
  • POSITION, ASSEMBLE AND START UP SINGLE HEAD SPLIT AIR CONDITIONING AND WATER HEATING HEAT PUMP SYSTEMS:P8A_PLM
  • RECOVER, PRESSURE TEST, EVACUATE, CHARGE AND LEAK TEST REFRIGERANTS - SPLIT SYSTEMS:P8A_PLM

  • 08:05 am - 04:35 pm
    Week(s): 46
    November: 11

    Location:
  • E2.M10 (through w/shop)
  • Modules:
  • INSTALL SEWERAGE PUMPSETS:P8A_PLM

  • 08:05 am - 04:35 pm
    Week(s): 28
    July: 9

    Location:
  • E2.M10 (through w/shop)
  • Modules:
  • LOCATE AND CLEAR BLOCKAGES:P8A_PLM
  • INSTALL DOMESTIC TREATMENT PLANTS:P8A_PLM
  • MAINTAIN EFFLUENT DISINFECTION SYSTEMS:P8A_PLM
  • INSTALL ON-SITE DISPOSAL SYSTEMS:P8A_PLM

  • 08:05 am - 04:35 pm
    Week(s): 32
    August: 6

    Location:
  • E2.M10 (through w/shop)
  • Modules:
  • INSTALL AND COMMISSION WATER HEATING SYSTEMS:P8A_PLM

  • 08:05 am - 04:35 pm
    Week(s): 36
    September: 3

    Location:
  • E2.M10 (through w/shop)
  • Modules:
  • COLLECT AND STORE ROOF WATER:P8A_PLM
  • INSTALL WATER PUMPSETS:P8A_PLM

  • 08:05 am - 04:35 pm
    Week(s): 46
    November: 12

    Location:
  • E2.M10 (through w/shop)
  • Modules:
  • INSTALL SEWERAGE PUMPSETS:P8A_PLM

  • 08:05 am - 04:35 pm
    Week(s): 42
    October: 15

    Location:
  • E7.116 & E7.118 Classroom & Hub
  • E7.G08b
  • Modules:
  • INSTALL AND TEST SPLIT SYSTEM AIR CONDITIONING:P8A_PLM
  • POSITION, ASSEMBLE AND START UP SINGLE HEAD SPLIT AIR CONDITIONING AND WATER HEATING HEAT PUMP SYSTEMS:P8A_PLM
  • RECOVER, PRESSURE TEST, EVACUATE, CHARGE AND LEAK TEST REFRIGERANTS - SPLIT SYSTEMS:P8A_PLM

  • 08:05 am - 04:35 pm
    Week(s): 28
    July: 10

    Location:
  • E2.M10 (through w/shop)
  • Modules:
  • LOCATE AND CLEAR BLOCKAGES:P8A_PLM
  • INSTALL DOMESTIC TREATMENT PLANTS:P8A_PLM
  • MAINTAIN EFFLUENT DISINFECTION SYSTEMS:P8A_PLM
  • INSTALL ON-SITE DISPOSAL SYSTEMS:P8A_PLM

  • 08:05 am - 04:35 pm
    Week(s): 32
    August: 7

    Location:
  • E2.M10 (through w/shop)
  • Modules:
  • INSTALL AND COMMISSION WATER HEATING SYSTEMS:P8A_PLM

  • 08:05 am - 04:35 pm
    Week(s): 36
    September: 4

    Location:
  • E2.M10 (through w/shop)
  • Modules:
  • COLLECT AND STORE ROOF WATER:P8A_PLM
  • INSTALL WATER PUMPSETS:P8A_PLM

  • 08:05 am - 04:35 pm
    Week(s): 46
    November: 13

    Location:
  • E2.M10 (through w/shop)
  • Modules:
  • INSTALL SEWERAGE PUMPSETS:P8A_PLM

  • 08:05 am - 04:35 pm
    Week(s): 42
    October: 16

    Location:
  • E7.111 Tech. Classroom
  • E7.G08d
  • Modules:
  • INSTALL AND TEST SPLIT SYSTEM AIR CONDITIONING:P8A_PLM
  • POSITION, ASSEMBLE AND START UP SINGLE HEAD SPLIT AIR CONDITIONING AND WATER HEATING HEAT PUMP SYSTEMS:P8A_PLM
  • RECOVER, PRESSURE TEST, EVACUATE, CHARGE AND LEAK TEST REFRIGERANTS - SPLIT SYSTEMS:P8A_PLM

  • 08:05 am - 04:35 pm
    Week(s): 28
    July: 11

    Location:
  • E2.M10 (through w/shop)
  • Modules:
  • LOCATE AND CLEAR BLOCKAGES:P8A_PLM
  • INSTALL DOMESTIC TREATMENT PLANTS:P8A_PLM
  • MAINTAIN EFFLUENT DISINFECTION SYSTEMS:P8A_PLM
  • INSTALL ON-SITE DISPOSAL SYSTEMS:P8A_PLM

  • 08:05 am - 04:35 pm
    Week(s): 32
    August: 8

    Location:
  • E2.M10 (through w/shop)
  • Modules:
  • INSTALL AND COMMISSION WATER HEATING SYSTEMS:P8A_PLM

  • 08:05 am - 04:35 pm
    Week(s): 36
    September: 5

    Location:
  • E2.M10 (through w/shop)
  • Modules:
  • COLLECT AND STORE ROOF WATER:P8A_PLM
  • INSTALL WATER PUMPSETS:P8A_PLM

  • 08:05 am - 04:35 pm
    Week(s): 46
    November: 14

    Location:
  • E2.M10 (through w/shop)
  • Modules:
  • INSTALL SEWERAGE PUMPSETS:P8A_PLM

  • 08:05 am - 04:35 pm
    Week(s): 42
    October: 17

    Location:
  • E7.111 Tech. Classroom
  • E7.G08d
  • Modules:
  • INSTALL AND TEST SPLIT SYSTEM AIR CONDITIONING:P8A_PLM
  • POSITION, ASSEMBLE AND START UP SINGLE HEAD SPLIT AIR CONDITIONING AND WATER HEATING HEAT PUMP SYSTEMS:P8A_PLM
  • RECOVER, PRESSURE TEST, EVACUATE, CHARGE AND LEAK TEST REFRIGERANTS - SPLIT SYSTEMS:P8A_PLM

  • 08:05 am - 04:35 pm
    Week(s): 28
    July: 12

    Location:
  • E2.M10 (through w/shop)
  • Modules:
  • LOCATE AND CLEAR BLOCKAGES:P8A_PLM
  • INSTALL DOMESTIC TREATMENT PLANTS:P8A_PLM
  • MAINTAIN EFFLUENT DISINFECTION SYSTEMS:P8A_PLM
  • INSTALL ON-SITE DISPOSAL SYSTEMS:P8A_PLM

  • 08:05 am - 04:35 pm
    Week(s): 32
    August: 9

    Location:
  • E2.M10 (through w/shop)
  • Modules:
  • INSTALL AND COMMISSION WATER HEATING SYSTEMS:P8A_PLM

  • 08:05 am - 04:35 pm
    Week(s): 36
    September: 6

    Location:
  • E2.M10 (through w/shop)
  • Modules:
  • COLLECT AND STORE ROOF WATER:P8A_PLM
  • INSTALL WATER PUMPSETS:P8A_PLM

  • 08:05 am - 04:35 pm
    Week(s): 46
    November: 15

    Location:
  • E2.M10 (through w/shop)
  • Modules:
  • INSTALL SEWERAGE PUMPSETS:P8A_PLM

  • 08:05 am - 04:35 pm
    Week(s): 42
    October: 18

    Location:
  • E7.G08d
  • Modules:
  • INSTALL AND TEST SPLIT SYSTEM AIR CONDITIONING:P8A_PLM
  • POSITION, ASSEMBLE AND START UP SINGLE HEAD SPLIT AIR CONDITIONING AND WATER HEATING HEAT PUMP SYSTEMS:P8A_PLM
  • RECOVER, PRESSURE TEST, EVACUATE, CHARGE AND LEAK TEST REFRIGERANTS - SPLIT SYSTEMS:P8A_PLM