Timetables

P9A_PLM_GRP

Note: Timetables are subject to change; re-visit StudentWeb for the most up-to-date information.

Semester 2

Monday Tuesday Wednesday Thursday Friday Saturday Sunday
08:05 am - 04:35 pm
Week(s): 30
July: 22

Location:
  • E2.M05 (through w/shop)
  • Modules:
  • MARK OUT MATERIALS:P9A_PLM
  • CARRY OUT SIMPLE CONCRETING AND RENDERING:P9A_PLM

  • 08:05 am - 04:35 pm
    Week(s): 34
    August: 19

    Location:
  • E2.M05 (through w/shop)
  • Modules:
  • FABRICATE AND INSTALL NON-FERROUS PRESSURE PIPING:P9A_PLM
  • ASSEMBLE MECHANICAL SERVICES COMPONENTS:P9A_PLM
  • INSTALL AND ADJUST WATER SERVICE CONTROLS AND DEVICES:P9A_PLM
  • INSTALL WATER SERVICE:P9A_PLM

  • 08:05 am - 04:35 pm
    Week(s): 38
    September: 16

    Location:
  • E2.M05 (through w/shop)
  • Modules:
  • WORK SAFELY AT HEIGHTS:P9A_PLM
  • OPERATE ELEVATED WORK PLATFORMS:P9A_PLM
  • WORK SAFELY ON ROOFS:P9A_PLM

  • 08:05 am - 04:35 pm
    Week(s): 44
    October: 28

    Location:
  • E2.M05 (through w/shop)
  • Modules:
  • FLASH PENETRATIONS THROUGH ROOFS AND WALLS:P9A_PLM
  • INSTALL AIR CONDITIONING CONTROL EQUIPMENT:P9A_PLM
  • INSTALL AND MAINTAIN EVAPORATIVE AIR COOLING SYSTEMS:P9A_PLM

  • 08:05 am - 04:35 pm
    Week(s): 48
    November: 25

    Location:
  • E2.M05 (through w/shop)
  • Modules:
  • ERECT AND DISMANTLE RESTRICTED HEIGHT SCAFFOLDING:P9A_PLM
  • CALCULATE AND INSTALL NATURAL VENTILATION FOR TYPE A GAS APPLIANCES:P9A_PLM
  • SIZE CONSUMER GAS PIPING SYSTEMS:P9A_PLM

  • 08:05 am - 04:35 pm
    Week(s): 30
    July: 23

    Location:
  • E2.M05 (through w/shop)
  • Modules:
  • MARK OUT MATERIALS:P9A_PLM
  • CARRY OUT SIMPLE CONCRETING AND RENDERING:P9A_PLM

  • 08:05 am - 04:35 pm
    Week(s): 34
    August: 20

    Location:
  • E2.M05 (through w/shop)
  • Modules:
  • FABRICATE AND INSTALL NON-FERROUS PRESSURE PIPING:P9A_PLM
  • ASSEMBLE MECHANICAL SERVICES COMPONENTS:P9A_PLM
  • INSTALL AND ADJUST WATER SERVICE CONTROLS AND DEVICES:P9A_PLM
  • INSTALL WATER SERVICE:P9A_PLM

  • 08:05 am - 04:35 pm
    Week(s): 38
    September: 17

    Location:
  • E2.M05 (through w/shop)
  • Modules:
  • WORK SAFELY AT HEIGHTS:P9A_PLM
  • OPERATE ELEVATED WORK PLATFORMS:P9A_PLM
  • WORK SAFELY ON ROOFS:P9A_PLM

  • 08:05 am - 04:35 pm
    Week(s): 44
    October: 29

    Location:
  • E2.M05 (through w/shop)
  • Modules:
  • FLASH PENETRATIONS THROUGH ROOFS AND WALLS:P9A_PLM
  • INSTALL AIR CONDITIONING CONTROL EQUIPMENT:P9A_PLM
  • INSTALL AND MAINTAIN EVAPORATIVE AIR COOLING SYSTEMS:P9A_PLM

  • 08:05 am - 04:35 pm
    Week(s): 48
    November: 26

    Location:
  • E2.M05 (through w/shop)
  • Modules:
  • ERECT AND DISMANTLE RESTRICTED HEIGHT SCAFFOLDING:P9A_PLM
  • CALCULATE AND INSTALL NATURAL VENTILATION FOR TYPE A GAS APPLIANCES:P9A_PLM
  • SIZE CONSUMER GAS PIPING SYSTEMS:P9A_PLM

  • 08:05 am - 04:35 pm
    Week(s): 30
    July: 24

    Location:
  • E2.M05 (through w/shop)
  • Modules:
  • MARK OUT MATERIALS:P9A_PLM
  • CARRY OUT SIMPLE CONCRETING AND RENDERING:P9A_PLM

  • 08:05 am - 04:35 pm
    Week(s): 34
    August: 21

    Location:
  • E2.M05 (through w/shop)
  • Modules:
  • FABRICATE AND INSTALL NON-FERROUS PRESSURE PIPING:P9A_PLM
  • ASSEMBLE MECHANICAL SERVICES COMPONENTS:P9A_PLM
  • INSTALL AND ADJUST WATER SERVICE CONTROLS AND DEVICES:P9A_PLM
  • INSTALL WATER SERVICE:P9A_PLM

  • 08:05 am - 04:35 pm
    Week(s): 38
    September: 18

    Location:
  • E2.M05 (through w/shop)
  • Modules:
  • WORK SAFELY AT HEIGHTS:P9A_PLM
  • OPERATE ELEVATED WORK PLATFORMS:P9A_PLM
  • WORK SAFELY ON ROOFS:P9A_PLM

  • 08:05 am - 04:35 pm
    Week(s): 44
    October: 30

    Location:
  • E2.M05 (through w/shop)
  • Modules:
  • FLASH PENETRATIONS THROUGH ROOFS AND WALLS:P9A_PLM
  • INSTALL AIR CONDITIONING CONTROL EQUIPMENT:P9A_PLM
  • INSTALL AND MAINTAIN EVAPORATIVE AIR COOLING SYSTEMS:P9A_PLM

  • 08:05 am - 04:35 pm
    Week(s): 48
    November: 27

    Location:
  • E2.M05 (through w/shop)
  • Modules:
  • ERECT AND DISMANTLE RESTRICTED HEIGHT SCAFFOLDING:P9A_PLM
  • CALCULATE AND INSTALL NATURAL VENTILATION FOR TYPE A GAS APPLIANCES:P9A_PLM
  • SIZE CONSUMER GAS PIPING SYSTEMS:P9A_PLM

  • 08:05 am - 04:35 pm
    Week(s): 30
    July: 25

    Location:
  • E2.M05 (through w/shop)
  • Modules:
  • MARK OUT MATERIALS:P9A_PLM
  • CARRY OUT SIMPLE CONCRETING AND RENDERING:P9A_PLM

  • 08:05 am - 04:35 pm
    Week(s): 34
    August: 22

    Location:
  • E2.M05 (through w/shop)
  • Modules:
  • FABRICATE AND INSTALL NON-FERROUS PRESSURE PIPING:P9A_PLM
  • ASSEMBLE MECHANICAL SERVICES COMPONENTS:P9A_PLM
  • INSTALL AND ADJUST WATER SERVICE CONTROLS AND DEVICES:P9A_PLM
  • INSTALL WATER SERVICE:P9A_PLM

  • 08:05 am - 04:35 pm
    Week(s): 44
    October: 31

    Location:
  • E2.M05 (through w/shop)
  • Modules:
  • FLASH PENETRATIONS THROUGH ROOFS AND WALLS:P9A_PLM
  • INSTALL AIR CONDITIONING CONTROL EQUIPMENT:P9A_PLM
  • INSTALL AND MAINTAIN EVAPORATIVE AIR COOLING SYSTEMS:P9A_PLM

  • 08:05 am - 04:35 pm
    Week(s): 48
    November: 28

    Location:
  • E2.M05 (through w/shop)
  • Modules:
  • ERECT AND DISMANTLE RESTRICTED HEIGHT SCAFFOLDING:P9A_PLM
  • CALCULATE AND INSTALL NATURAL VENTILATION FOR TYPE A GAS APPLIANCES:P9A_PLM
  • SIZE CONSUMER GAS PIPING SYSTEMS:P9A_PLM

  • 08:05 am - 04:35 pm
    Week(s): 30
    July: 26

    Location:
  • E2.M05 (through w/shop)
  • Modules:
  • MARK OUT MATERIALS:P9A_PLM
  • CARRY OUT SIMPLE CONCRETING AND RENDERING:P9A_PLM

  • 08:05 am - 04:35 pm
    Week(s): 34
    August: 23

    Location:
  • E2.M05 (through w/shop)
  • Modules:
  • FABRICATE AND INSTALL NON-FERROUS PRESSURE PIPING:P9A_PLM
  • ASSEMBLE MECHANICAL SERVICES COMPONENTS:P9A_PLM
  • INSTALL AND ADJUST WATER SERVICE CONTROLS AND DEVICES:P9A_PLM
  • INSTALL WATER SERVICE:P9A_PLM

  • 08:05 am - 04:35 pm
    Week(s): 38
    September: 20

    Location:
  • E2.M05 (through w/shop)
  • Modules:
  • WORK SAFELY AT HEIGHTS:P9A_PLM
  • OPERATE ELEVATED WORK PLATFORMS:P9A_PLM
  • WORK SAFELY ON ROOFS:P9A_PLM

  • 08:05 am - 04:35 pm
    Week(s): 44
    October: 32

    Location:
  • E2.M05 (through w/shop)
  • Modules:
  • FLASH PENETRATIONS THROUGH ROOFS AND WALLS:P9A_PLM
  • INSTALL AIR CONDITIONING CONTROL EQUIPMENT:P9A_PLM
  • INSTALL AND MAINTAIN EVAPORATIVE AIR COOLING SYSTEMS:P9A_PLM

  • 08:05 am - 04:35 pm
    Week(s): 48
    November: 29

    Location:
  • E2.M05 (through w/shop)
  • Modules:
  • ERECT AND DISMANTLE RESTRICTED HEIGHT SCAFFOLDING:P9A_PLM
  • CALCULATE AND INSTALL NATURAL VENTILATION FOR TYPE A GAS APPLIANCES:P9A_PLM
  • SIZE CONSUMER GAS PIPING SYSTEMS:P9A_PLM