Timetables

BP20M_P22E_PLM_GRP

Note: Timetables are subject to change; re-visit StudentWeb for the most up-to-date information.

Semester 2

Monday Tuesday Wednesday Thursday Friday Saturday Sunday
08:05 am - 04:35 pm
Week(s): 34
August: 19

Location:
  • B2.M07 SP Classroom
  • Modules:
  • COLLECT AND STORE ROOF WATER:BP20M_P22E_PLM
  • INSTALL WATER PUMPSETS:BP20M_P22E_PLM
  • INSTALL BACKFLOW PREVENTION DEVICES:BP20M_P22E_PLM

  • 08:05 am - 04:35 pm
    Week(s): 38
    September: 16

    Location:
  • B2.M07 SP Classroom
  • Modules:
  • DESIGN DOMESTIC URBAN IRRIGATION SYSTEMS:BP20M_P22E_PLM
  • SET OUT, INSTALL AND COMMISSION IRRIGATION SYSTEMS:BP20M_P22E_PLM
  • INSTALL AND COMMISSION DOMESTIC IRRIGATION PUMPS:BP20M_P22E_PLM
  • INSTALL SEWERAGE PUMPSETS:BP20M_P22E_PLM
  • CONNECT AND INSTALL STORAGE TANKS TO A DOMESTIC WATER SUPPLY:BP20M_P22E_PLM

  • 08:05 am - 04:35 pm
    Week(s): 41
    October: 7

    Location:
  • B2.M07 SP Classroom
  • Modules:
  • INSTALL GAS PRESSURE CONTROL EQUIPMENT:BP20M_P22E_PLM

  • 08:05 am - 04:35 pm
    Week(s): 48
    November: 25

    Location:
  • B2.M07 SP Classroom
  • Modules:
  • INSTALL TRENCH SUPPORT:BP20M_P22E_PLM
  • LOCATE AND CLEAR BLOCKAGES:BP20M_P22E_PLM
  • INSTALL PRE-TREATMENT FACILITIES:BP20M_P22E_PLM

  • 08:05 am - 04:35 pm
    Week(s): 34
    August: 20

    Location:
  • B2.M07 SP Classroom
  • Modules:
  • COLLECT AND STORE ROOF WATER:BP20M_P22E_PLM
  • INSTALL WATER PUMPSETS:BP20M_P22E_PLM
  • INSTALL BACKFLOW PREVENTION DEVICES:BP20M_P22E_PLM

  • 08:05 am - 04:35 pm
    Week(s): 38
    September: 17

    Location:
  • B2.M07 SP Classroom
  • Modules:
  • DESIGN DOMESTIC URBAN IRRIGATION SYSTEMS:BP20M_P22E_PLM
  • SET OUT, INSTALL AND COMMISSION IRRIGATION SYSTEMS:BP20M_P22E_PLM
  • INSTALL AND COMMISSION DOMESTIC IRRIGATION PUMPS:BP20M_P22E_PLM
  • INSTALL SEWERAGE PUMPSETS:BP20M_P22E_PLM
  • CONNECT AND INSTALL STORAGE TANKS TO A DOMESTIC WATER SUPPLY:BP20M_P22E_PLM

  • 08:05 am - 04:35 pm
    Week(s): 41
    October: 8

    Location:
  • B2.M07 SP Classroom
  • Modules:
  • INSTALL GAS PRESSURE CONTROL EQUIPMENT:BP20M_P22E_PLM

  • 08:05 am - 04:35 pm
    Week(s): 44
    October: 29

    Location:
  • B2.M07 SP Classroom
  • Modules:
  • INSTALL TRENCH SUPPORT:BP20M_P22E_PLM
  • PLAN LAYOUT AND INSTALL BELOW GROUND SANITARY DRAINAGE SYSTEMS:BP20M_P22E_PLM
  • INSTALL ON-SITE DOMESTIC WASTEWATER TREATMENT PLANTS AND DISPOSAL SYSTEMS:BP20M_P22E_PLM
  • ENTER AND WORK IN CONFINED SPACES:BP20M_P22E_PLM

  • 08:05 am - 04:35 pm
    Week(s): 48
    November: 26

    Location:
  • B2.M07 SP Classroom
  • Modules:
  • INSTALL TRENCH SUPPORT:BP20M_P22E_PLM
  • LOCATE AND CLEAR BLOCKAGES:BP20M_P22E_PLM
  • INSTALL PRE-TREATMENT FACILITIES:BP20M_P22E_PLM

  • 08:05 am - 11:55 am
    Week(s): 34
    August: 21

    Location:
  • B2.M07 SP Classroom
  • Modules:
  • COLLECT AND STORE ROOF WATER:BP20M_P22E_PLM
  • INSTALL WATER PUMPSETS:BP20M_P22E_PLM
  • INSTALL BACKFLOW PREVENTION DEVICES:BP20M_P22E_PLM

  • 08:05 am - 11:55 am
    Week(s): 38
    September: 18

    Location:
  • B2.M07 SP Classroom
  • Modules:
  • DESIGN DOMESTIC URBAN IRRIGATION SYSTEMS:BP20M_P22E_PLM
  • SET OUT, INSTALL AND COMMISSION IRRIGATION SYSTEMS:BP20M_P22E_PLM
  • INSTALL AND COMMISSION DOMESTIC IRRIGATION PUMPS:BP20M_P22E_PLM
  • INSTALL SEWERAGE PUMPSETS:BP20M_P22E_PLM
  • CONNECT AND INSTALL STORAGE TANKS TO A DOMESTIC WATER SUPPLY:BP20M_P22E_PLM

  • 12:45 pm - 04:35 pm
    Week(s): 38
    September: 18

    Location:
  • B2.M07 SP Classroom
  • Modules:
  • DESIGN DOMESTIC URBAN IRRIGATION SYSTEMS:BP20M_P22E_PLM
  • SET OUT, INSTALL AND COMMISSION IRRIGATION SYSTEMS:BP20M_P22E_PLM
  • INSTALL AND COMMISSION DOMESTIC IRRIGATION PUMPS:BP20M_P22E_PLM
  • INSTALL SEWERAGE PUMPSETS:BP20M_P22E_PLM
  • CONNECT AND INSTALL STORAGE TANKS TO A DOMESTIC WATER SUPPLY:BP20M_P22E_PLM

  • 08:05 am - 11:55 am
    Week(s): 41
    October: 9

    Location:
  • B2.M07 SP Classroom
  • Modules:
  • INSTALL GAS PRESSURE CONTROL EQUIPMENT:BP20M_P22E_PLM

  • 12:45 pm - 04:35 pm
    Week(s): 41
    October: 9

    Location:
  • B2.M07 SP Classroom
  • Modules:
  • INSTALL GAS PRESSURE CONTROL EQUIPMENT:BP20M_P22E_PLM

  • 08:05 am - 04:35 pm
    Week(s): 44
    October: 30

    Location:
  • B2.M07 SP Classroom
  • Modules:
  • INSTALL TRENCH SUPPORT:BP20M_P22E_PLM
  • PLAN LAYOUT AND INSTALL BELOW GROUND SANITARY DRAINAGE SYSTEMS:BP20M_P22E_PLM
  • INSTALL ON-SITE DOMESTIC WASTEWATER TREATMENT PLANTS AND DISPOSAL SYSTEMS:BP20M_P22E_PLM
  • ENTER AND WORK IN CONFINED SPACES:BP20M_P22E_PLM

  • 08:05 am - 04:35 pm
    Week(s): 48
    November: 27

    Location:
  • B2.M07 SP Classroom
  • Modules:
  • INSTALL TRENCH SUPPORT:BP20M_P22E_PLM
  • LOCATE AND CLEAR BLOCKAGES:BP20M_P22E_PLM
  • INSTALL PRE-TREATMENT FACILITIES:BP20M_P22E_PLM

  • 08:05 am - 04:35 pm
    Week(s): 34
    August: 22

    Location:
  • B2.M07 SP Classroom
  • Modules:
  • COLLECT AND STORE ROOF WATER:BP20M_P22E_PLM
  • INSTALL WATER PUMPSETS:BP20M_P22E_PLM
  • INSTALL BACKFLOW PREVENTION DEVICES:BP20M_P22E_PLM

  • 08:05 am - 04:35 pm
    Week(s): 38
    September: 19

    Location:
  • B2.M07 SP Classroom
  • Modules:
  • DESIGN DOMESTIC URBAN IRRIGATION SYSTEMS:BP20M_P22E_PLM
  • SET OUT, INSTALL AND COMMISSION IRRIGATION SYSTEMS:BP20M_P22E_PLM
  • INSTALL AND COMMISSION DOMESTIC IRRIGATION PUMPS:BP20M_P22E_PLM
  • INSTALL SEWERAGE PUMPSETS:BP20M_P22E_PLM
  • CONNECT AND INSTALL STORAGE TANKS TO A DOMESTIC WATER SUPPLY:BP20M_P22E_PLM

  • 08:05 am - 04:35 pm
    Week(s): 41
    October: 10

    Location:
  • B2.M07 SP Classroom
  • Modules:
  • INSTALL GAS PRESSURE CONTROL EQUIPMENT:BP20M_P22E_PLM

  • 08:05 am - 04:35 pm
    Week(s): 44
    October: 31

    Location:
  • B2.M07 SP Classroom
  • Modules:
  • INSTALL TRENCH SUPPORT:BP20M_P22E_PLM
  • PLAN LAYOUT AND INSTALL BELOW GROUND SANITARY DRAINAGE SYSTEMS:BP20M_P22E_PLM
  • INSTALL ON-SITE DOMESTIC WASTEWATER TREATMENT PLANTS AND DISPOSAL SYSTEMS:BP20M_P22E_PLM
  • ENTER AND WORK IN CONFINED SPACES:BP20M_P22E_PLM

  • 08:05 am - 04:35 pm
    Week(s): 48
    November: 28

    Location:
  • B2.M07 SP Classroom
  • Modules:
  • INSTALL TRENCH SUPPORT:BP20M_P22E_PLM
  • LOCATE AND CLEAR BLOCKAGES:BP20M_P22E_PLM
  • INSTALL PRE-TREATMENT FACILITIES:BP20M_P22E_PLM

  • 08:05 am - 04:35 pm
    Week(s): 34
    August: 23

    Location:
  • B2.M07 SP Classroom
  • Modules:
  • COLLECT AND STORE ROOF WATER:BP20M_P22E_PLM
  • INSTALL WATER PUMPSETS:BP20M_P22E_PLM
  • INSTALL BACKFLOW PREVENTION DEVICES:BP20M_P22E_PLM

  • 08:05 am - 04:35 pm
    Week(s): 44
    November: 1

    Location:
  • B2.M07 SP Classroom
  • Modules:
  • INSTALL TRENCH SUPPORT:BP20M_P22E_PLM
  • PLAN LAYOUT AND INSTALL BELOW GROUND SANITARY DRAINAGE SYSTEMS:BP20M_P22E_PLM
  • INSTALL ON-SITE DOMESTIC WASTEWATER TREATMENT PLANTS AND DISPOSAL SYSTEMS:BP20M_P22E_PLM
  • ENTER AND WORK IN CONFINED SPACES:BP20M_P22E_PLM