Monday |
Tuesday |
Wednesday |
Thursday |
Friday |
Saturday |
Sunday |
08:05 am - 04:35 pm
Week(s): 30
July: 22
Location: B2.M01 SP ClassroomModules: INSTALL STORMWATER AND SUB-SOIL DRAINAGE SYSTEMS AND DRAIN WORK SITE:BP20M_P23B_PLMSIZE AND INSTALL CONSUMER GAS PIPING SYSTEMS:BP20M_P23B_PLMINSTALL PREFABRICATED INSPECTION OPENINGS AND INSPECTION CHAMBERS:BP20M_P23B_PLMINSTALL GAS PRESSURE CONTROL EQUIPMENT:BP20M_P23B_PLM
08:05 am - 04:35 pm
Week(s): 34
August: 19
Location: B2.M01 SP ClassroomModules: COLLECT AND STORE ROOF WATER:BP20M_P23B_PLMINSTALL WATER PUMPSETS:BP20M_P23B_PLMINSTALL BACKFLOW PREVENTION DEVICES:BP20M_P23B_PLM
08:05 am - 04:35 pm
Week(s): 38
September: 16
Location: B2.M01 SP ClassroomModules: DESIGN DOMESTIC URBAN IRRIGATION SYSTEMS:BP20M_P23B_PLMSET OUT, INSTALL AND COMMISSION IRRIGATION SYSTEMS:BP20M_P23B_PLMINSTALL AND COMMISSION DOMESTIC IRRIGATION PUMPS:BP20M_P23B_PLM
08:05 am - 04:35 pm
Week(s): 48
November: 25
Location: B2.M01 SP ClassroomModules: INSTALL SEWERAGE PUMPSETS:BP20M_P23B_PLMCONNECT AND INSTALL STORAGE TANKS TO A DOMESTIC WATER SUPPLY:BP20M_P23B_PLM
|
08:05 am - 04:35 pm
Week(s): 30
July: 23
Location: B2.M01 SP ClassroomModules: INSTALL STORMWATER AND SUB-SOIL DRAINAGE SYSTEMS AND DRAIN WORK SITE:BP20M_P23B_PLMSIZE AND INSTALL CONSUMER GAS PIPING SYSTEMS:BP20M_P23B_PLMINSTALL PREFABRICATED INSPECTION OPENINGS AND INSPECTION CHAMBERS:BP20M_P23B_PLMINSTALL GAS PRESSURE CONTROL EQUIPMENT:BP20M_P23B_PLM
08:05 am - 04:35 pm
Week(s): 34
August: 20
Location: B2.M01 SP ClassroomModules: COLLECT AND STORE ROOF WATER:BP20M_P23B_PLMINSTALL WATER PUMPSETS:BP20M_P23B_PLMINSTALL BACKFLOW PREVENTION DEVICES:BP20M_P23B_PLM
08:05 am - 04:35 pm
Week(s): 38
September: 17
Location: B2.M01 SP ClassroomModules: DESIGN DOMESTIC URBAN IRRIGATION SYSTEMS:BP20M_P23B_PLMSET OUT, INSTALL AND COMMISSION IRRIGATION SYSTEMS:BP20M_P23B_PLMINSTALL AND COMMISSION DOMESTIC IRRIGATION PUMPS:BP20M_P23B_PLM
08:05 am - 04:35 pm
Week(s): 48
November: 26
Location: L2.G30 Sandpit Workspace AL2.G30 Sandpit Workspace BModules: INSTALL SEWERAGE PUMPSETS:BP20M_P23B_PLMCONNECT AND INSTALL STORAGE TANKS TO A DOMESTIC WATER SUPPLY:BP20M_P23B_PLM
|
08:05 am - 04:35 pm
Week(s): 30
July: 24
Location: B2.M01 SP ClassroomModules: INSTALL STORMWATER AND SUB-SOIL DRAINAGE SYSTEMS AND DRAIN WORK SITE:BP20M_P23B_PLMSIZE AND INSTALL CONSUMER GAS PIPING SYSTEMS:BP20M_P23B_PLMINSTALL PREFABRICATED INSPECTION OPENINGS AND INSPECTION CHAMBERS:BP20M_P23B_PLMINSTALL GAS PRESSURE CONTROL EQUIPMENT:BP20M_P23B_PLM
08:05 am - 04:35 pm
Week(s): 38
September: 18
Location: B2.M01 SP ClassroomModules: DESIGN DOMESTIC URBAN IRRIGATION SYSTEMS:BP20M_P23B_PLMSET OUT, INSTALL AND COMMISSION IRRIGATION SYSTEMS:BP20M_P23B_PLMINSTALL AND COMMISSION DOMESTIC IRRIGATION PUMPS:BP20M_P23B_PLM
08:05 am - 04:35 pm
Week(s): 48
November: 27
Location: L2.G30 Sandpit Workspace AL2.G30 Sandpit Workspace BModules: INSTALL TRENCH SUPPORT:BP20M_P23B_PLMPLAN LAYOUT AND INSTALL BELOW GROUND SANITARY DRAINAGE SYSTEMS:BP20M_P23B_PLMINSTALL ON-SITE DOMESTIC WASTEWATER TREATMENT PLANTS AND DISPOSAL SYSTEMS:BP20M_P23B_PLMENTER AND WORK IN CONFINED SPACES:BP20M_P23B_PLM
|
08:05 am - 04:35 pm
Week(s): 30
July: 25
Location: B2.M01 SP ClassroomModules: INSTALL STORMWATER AND SUB-SOIL DRAINAGE SYSTEMS AND DRAIN WORK SITE:BP20M_P23B_PLMSIZE AND INSTALL CONSUMER GAS PIPING SYSTEMS:BP20M_P23B_PLMINSTALL PREFABRICATED INSPECTION OPENINGS AND INSPECTION CHAMBERS:BP20M_P23B_PLMINSTALL GAS PRESSURE CONTROL EQUIPMENT:BP20M_P23B_PLM
08:05 am - 04:35 pm
Week(s): 34
August: 22
Location: B2.M01 SP ClassroomModules: COLLECT AND STORE ROOF WATER:BP20M_P23B_PLMINSTALL WATER PUMPSETS:BP20M_P23B_PLMINSTALL BACKFLOW PREVENTION DEVICES:BP20M_P23B_PLM
08:05 am - 04:35 pm
Week(s): 38
September: 19
Location: B2.M01 SP ClassroomModules: DESIGN DOMESTIC URBAN IRRIGATION SYSTEMS:BP20M_P23B_PLMSET OUT, INSTALL AND COMMISSION IRRIGATION SYSTEMS:BP20M_P23B_PLMINSTALL AND COMMISSION DOMESTIC IRRIGATION PUMPS:BP20M_P23B_PLM
08:05 am - 04:35 pm
Week(s): 48
November: 28
Location: B2.M01 SP ClassroomModules: INSTALL TRENCH SUPPORT:BP20M_P23B_PLMPLAN LAYOUT AND INSTALL BELOW GROUND SANITARY DRAINAGE SYSTEMS:BP20M_P23B_PLMINSTALL ON-SITE DOMESTIC WASTEWATER TREATMENT PLANTS AND DISPOSAL SYSTEMS:BP20M_P23B_PLMENTER AND WORK IN CONFINED SPACES:BP20M_P23B_PLM
|
08:05 am - 04:35 pm
Week(s): 30
July: 26
Location: B2.M01 SP ClassroomModules: INSTALL STORMWATER AND SUB-SOIL DRAINAGE SYSTEMS AND DRAIN WORK SITE:BP20M_P23B_PLMSIZE AND INSTALL CONSUMER GAS PIPING SYSTEMS:BP20M_P23B_PLMINSTALL PREFABRICATED INSPECTION OPENINGS AND INSPECTION CHAMBERS:BP20M_P23B_PLMINSTALL GAS PRESSURE CONTROL EQUIPMENT:BP20M_P23B_PLM
08:05 am - 04:35 pm
Week(s): 34
August: 23
Location: B2.M01 SP ClassroomModules: COLLECT AND STORE ROOF WATER:BP20M_P23B_PLMINSTALL WATER PUMPSETS:BP20M_P23B_PLMINSTALL BACKFLOW PREVENTION DEVICES:BP20M_P23B_PLM
| | |