Timetables

BP20M_P23B_PLM_GRP

Note: Timetables are subject to change; re-visit StudentWeb for the most up-to-date information.

Semester 2

Monday Tuesday Wednesday Thursday Friday Saturday Sunday
08:05 am - 04:35 pm
Week(s): 30
July: 22

Location:
  • B2.M01 SP Classroom
  • Modules:
  • INSTALL STORMWATER AND SUB-SOIL DRAINAGE SYSTEMS AND DRAIN WORK SITE:BP20M_P23B_PLM
  • SIZE AND INSTALL CONSUMER GAS PIPING SYSTEMS:BP20M_P23B_PLM
  • INSTALL PREFABRICATED INSPECTION OPENINGS AND INSPECTION CHAMBERS:BP20M_P23B_PLM
  • INSTALL GAS PRESSURE CONTROL EQUIPMENT:BP20M_P23B_PLM

  • 08:05 am - 04:35 pm
    Week(s): 34
    August: 19

    Location:
  • B2.M01 SP Classroom
  • Modules:
  • COLLECT AND STORE ROOF WATER:BP20M_P23B_PLM
  • INSTALL WATER PUMPSETS:BP20M_P23B_PLM
  • INSTALL BACKFLOW PREVENTION DEVICES:BP20M_P23B_PLM

  • 08:05 am - 04:35 pm
    Week(s): 38
    September: 16

    Location:
  • B2.M01 SP Classroom
  • Modules:
  • DESIGN DOMESTIC URBAN IRRIGATION SYSTEMS:BP20M_P23B_PLM
  • SET OUT, INSTALL AND COMMISSION IRRIGATION SYSTEMS:BP20M_P23B_PLM
  • INSTALL AND COMMISSION DOMESTIC IRRIGATION PUMPS:BP20M_P23B_PLM

  • 08:05 am - 04:35 pm
    Week(s): 48
    November: 25

    Location:
  • B2.M01 SP Classroom
  • Modules:
  • INSTALL SEWERAGE PUMPSETS:BP20M_P23B_PLM
  • CONNECT AND INSTALL STORAGE TANKS TO A DOMESTIC WATER SUPPLY:BP20M_P23B_PLM

  • 08:05 am - 04:35 pm
    Week(s): 30
    July: 23

    Location:
  • B2.M01 SP Classroom
  • Modules:
  • INSTALL STORMWATER AND SUB-SOIL DRAINAGE SYSTEMS AND DRAIN WORK SITE:BP20M_P23B_PLM
  • SIZE AND INSTALL CONSUMER GAS PIPING SYSTEMS:BP20M_P23B_PLM
  • INSTALL PREFABRICATED INSPECTION OPENINGS AND INSPECTION CHAMBERS:BP20M_P23B_PLM
  • INSTALL GAS PRESSURE CONTROL EQUIPMENT:BP20M_P23B_PLM

  • 08:05 am - 04:35 pm
    Week(s): 34
    August: 20

    Location:
  • B2.M01 SP Classroom
  • Modules:
  • COLLECT AND STORE ROOF WATER:BP20M_P23B_PLM
  • INSTALL WATER PUMPSETS:BP20M_P23B_PLM
  • INSTALL BACKFLOW PREVENTION DEVICES:BP20M_P23B_PLM

  • 08:05 am - 04:35 pm
    Week(s): 38
    September: 17

    Location:
  • B2.M01 SP Classroom
  • Modules:
  • DESIGN DOMESTIC URBAN IRRIGATION SYSTEMS:BP20M_P23B_PLM
  • SET OUT, INSTALL AND COMMISSION IRRIGATION SYSTEMS:BP20M_P23B_PLM
  • INSTALL AND COMMISSION DOMESTIC IRRIGATION PUMPS:BP20M_P23B_PLM

  • 08:05 am - 04:35 pm
    Week(s): 48
    November: 26

    Location:
  • L2.G30 Sandpit Workspace A
  • L2.G30 Sandpit Workspace B
  • Modules:
  • INSTALL SEWERAGE PUMPSETS:BP20M_P23B_PLM
  • CONNECT AND INSTALL STORAGE TANKS TO A DOMESTIC WATER SUPPLY:BP20M_P23B_PLM

  • 08:05 am - 04:35 pm
    Week(s): 30
    July: 24

    Location:
  • B2.M01 SP Classroom
  • Modules:
  • INSTALL STORMWATER AND SUB-SOIL DRAINAGE SYSTEMS AND DRAIN WORK SITE:BP20M_P23B_PLM
  • SIZE AND INSTALL CONSUMER GAS PIPING SYSTEMS:BP20M_P23B_PLM
  • INSTALL PREFABRICATED INSPECTION OPENINGS AND INSPECTION CHAMBERS:BP20M_P23B_PLM
  • INSTALL GAS PRESSURE CONTROL EQUIPMENT:BP20M_P23B_PLM

  • 08:05 am - 04:35 pm
    Week(s): 38
    September: 18

    Location:
  • B2.M01 SP Classroom
  • Modules:
  • DESIGN DOMESTIC URBAN IRRIGATION SYSTEMS:BP20M_P23B_PLM
  • SET OUT, INSTALL AND COMMISSION IRRIGATION SYSTEMS:BP20M_P23B_PLM
  • INSTALL AND COMMISSION DOMESTIC IRRIGATION PUMPS:BP20M_P23B_PLM

  • 08:05 am - 04:35 pm
    Week(s): 48
    November: 27

    Location:
  • L2.G30 Sandpit Workspace A
  • L2.G30 Sandpit Workspace B
  • Modules:
  • INSTALL TRENCH SUPPORT:BP20M_P23B_PLM
  • PLAN LAYOUT AND INSTALL BELOW GROUND SANITARY DRAINAGE SYSTEMS:BP20M_P23B_PLM
  • INSTALL ON-SITE DOMESTIC WASTEWATER TREATMENT PLANTS AND DISPOSAL SYSTEMS:BP20M_P23B_PLM
  • ENTER AND WORK IN CONFINED SPACES:BP20M_P23B_PLM

  • 08:05 am - 04:35 pm
    Week(s): 30
    July: 25

    Location:
  • B2.M01 SP Classroom
  • Modules:
  • INSTALL STORMWATER AND SUB-SOIL DRAINAGE SYSTEMS AND DRAIN WORK SITE:BP20M_P23B_PLM
  • SIZE AND INSTALL CONSUMER GAS PIPING SYSTEMS:BP20M_P23B_PLM
  • INSTALL PREFABRICATED INSPECTION OPENINGS AND INSPECTION CHAMBERS:BP20M_P23B_PLM
  • INSTALL GAS PRESSURE CONTROL EQUIPMENT:BP20M_P23B_PLM

  • 08:05 am - 04:35 pm
    Week(s): 34
    August: 22

    Location:
  • B2.M01 SP Classroom
  • Modules:
  • COLLECT AND STORE ROOF WATER:BP20M_P23B_PLM
  • INSTALL WATER PUMPSETS:BP20M_P23B_PLM
  • INSTALL BACKFLOW PREVENTION DEVICES:BP20M_P23B_PLM

  • 08:05 am - 04:35 pm
    Week(s): 38
    September: 19

    Location:
  • B2.M01 SP Classroom
  • Modules:
  • DESIGN DOMESTIC URBAN IRRIGATION SYSTEMS:BP20M_P23B_PLM
  • SET OUT, INSTALL AND COMMISSION IRRIGATION SYSTEMS:BP20M_P23B_PLM
  • INSTALL AND COMMISSION DOMESTIC IRRIGATION PUMPS:BP20M_P23B_PLM

  • 08:05 am - 04:35 pm
    Week(s): 48
    November: 28

    Location:
  • B2.M01 SP Classroom
  • Modules:
  • INSTALL TRENCH SUPPORT:BP20M_P23B_PLM
  • PLAN LAYOUT AND INSTALL BELOW GROUND SANITARY DRAINAGE SYSTEMS:BP20M_P23B_PLM
  • INSTALL ON-SITE DOMESTIC WASTEWATER TREATMENT PLANTS AND DISPOSAL SYSTEMS:BP20M_P23B_PLM
  • ENTER AND WORK IN CONFINED SPACES:BP20M_P23B_PLM

  • 08:05 am - 04:35 pm
    Week(s): 30
    July: 26

    Location:
  • B2.M01 SP Classroom
  • Modules:
  • INSTALL STORMWATER AND SUB-SOIL DRAINAGE SYSTEMS AND DRAIN WORK SITE:BP20M_P23B_PLM
  • SIZE AND INSTALL CONSUMER GAS PIPING SYSTEMS:BP20M_P23B_PLM
  • INSTALL PREFABRICATED INSPECTION OPENINGS AND INSPECTION CHAMBERS:BP20M_P23B_PLM
  • INSTALL GAS PRESSURE CONTROL EQUIPMENT:BP20M_P23B_PLM

  • 08:05 am - 04:35 pm
    Week(s): 34
    August: 23

    Location:
  • B2.M01 SP Classroom
  • Modules:
  • COLLECT AND STORE ROOF WATER:BP20M_P23B_PLM
  • INSTALL WATER PUMPSETS:BP20M_P23B_PLM
  • INSTALL BACKFLOW PREVENTION DEVICES:BP20M_P23B_PLM