Timetables

BP20M_P23C_PLM_GRP

Note: Timetables are subject to change; re-visit StudentWeb for the most up-to-date information.

Semester 2

Monday Tuesday Wednesday Thursday Friday Saturday Sunday
08:05 am - 04:35 pm
Week(s): 36
September: 2

Location:
  • B2.M07 SP Classroom
  • Modules:
  • WORK SAFELY AT HEIGHTS:BP20M_P23C_PLM
  • OPERATE ELEVATED WORK PLATFORMS UP TO 11 METRES:BP20M_P23C_PLM
  • WORK EFFECTIVELY IN THE PLUMBING SERVICES SECTOR:BP20M_P23C_PLM
  • WORK SAFELY ON ROOFS:BP20M_P23C_PLM

  • 08:05 am - 04:35 pm
    Week(s): 42
    October: 14

    Location:
  • B2.M07 SP Classroom
  • Modules:
  • CARRY OUT SIMPLE CONCRETING AND RENDERING:BP20M_P23C_PLM
  • INSTALL STORMWATER AND SUB-SOIL DRAINAGE SYSTEMS AND DRAIN WORK SITE:BP20M_P23C_PLM
  • INSTALL PREFABRICATED INSPECTION OPENINGS AND INSPECTION CHAMBERS:BP20M_P23C_PLM

  • 08:05 am - 04:35 pm
    Week(s): 46
    November: 11

    Location:
  • B2.M07 SP Classroom
  • Modules:
  • COLLECT AND STORE ROOF WATER:BP20M_P23C_PLM
  • INSTALL WATER PUMPSETS:BP20M_P23C_PLM
  • INSTALL BACKFLOW PREVENTION DEVICES:BP20M_P23C_PLM

  • 08:05 am - 04:35 pm
    Week(s): 50
    December: 9

    Location:
  • B2.M07 SP Classroom
  • Modules:
  • DESIGN DOMESTIC URBAN IRRIGATION SYSTEMS:BP20M_P23C_PLM
  • SET OUT, INSTALL AND COMMISSION IRRIGATION SYSTEMS:BP20M_P23C_PLM
  • INSTALL AND COMMISSION DOMESTIC IRRIGATION PUMPS:BP20M_P23C_PLM
  • INSTALL SEWERAGE PUMPSETS:BP20M_P23C_PLM
  • CONNECT AND INSTALL STORAGE TANKS TO A DOMESTIC WATER SUPPLY:BP20M_P23C_PLM

  • 08:05 am - 04:35 pm
    Week(s): 36
    September: 3

    Location:
  • B2.M07 SP Classroom
  • Modules:
  • WORK SAFELY AT HEIGHTS:BP20M_P23C_PLM
  • OPERATE ELEVATED WORK PLATFORMS UP TO 11 METRES:BP20M_P23C_PLM
  • WORK EFFECTIVELY IN THE PLUMBING SERVICES SECTOR:BP20M_P23C_PLM
  • WORK SAFELY ON ROOFS:BP20M_P23C_PLM

  • 08:05 am - 04:35 pm
    Week(s): 42
    October: 15

    Location:
  • B2.M07 SP Classroom
  • Modules:
  • CARRY OUT SIMPLE CONCRETING AND RENDERING:BP20M_P23C_PLM
  • INSTALL STORMWATER AND SUB-SOIL DRAINAGE SYSTEMS AND DRAIN WORK SITE:BP20M_P23C_PLM
  • INSTALL PREFABRICATED INSPECTION OPENINGS AND INSPECTION CHAMBERS:BP20M_P23C_PLM

  • 08:05 am - 04:35 pm
    Week(s): 46
    November: 12

    Location:
  • B2.M07 SP Classroom
  • Modules:
  • COLLECT AND STORE ROOF WATER:BP20M_P23C_PLM
  • INSTALL WATER PUMPSETS:BP20M_P23C_PLM
  • INSTALL BACKFLOW PREVENTION DEVICES:BP20M_P23C_PLM

  • 08:05 am - 04:35 pm
    Week(s): 50
    December: 10

    Location:
  • B2.M07 SP Classroom
  • Modules:
  • DESIGN DOMESTIC URBAN IRRIGATION SYSTEMS:BP20M_P23C_PLM
  • SET OUT, INSTALL AND COMMISSION IRRIGATION SYSTEMS:BP20M_P23C_PLM
  • INSTALL AND COMMISSION DOMESTIC IRRIGATION PUMPS:BP20M_P23C_PLM
  • INSTALL SEWERAGE PUMPSETS:BP20M_P23C_PLM
  • CONNECT AND INSTALL STORAGE TANKS TO A DOMESTIC WATER SUPPLY:BP20M_P23C_PLM

  • 08:05 am - 11:55 am
    Week(s): 36
    September: 4

    Location:
  • B2.M07 SP Classroom
  • Modules:
  • WORK SAFELY AT HEIGHTS:BP20M_P23C_PLM
  • OPERATE ELEVATED WORK PLATFORMS UP TO 11 METRES:BP20M_P23C_PLM
  • WORK EFFECTIVELY IN THE PLUMBING SERVICES SECTOR:BP20M_P23C_PLM
  • WORK SAFELY ON ROOFS:BP20M_P23C_PLM

  • 12:45 pm - 04:35 pm
    Week(s): 36
    September: 4

    Location:
  • B2.M07 SP Classroom
  • Modules:
  • WORK SAFELY AT HEIGHTS:BP20M_P23C_PLM
  • OPERATE ELEVATED WORK PLATFORMS UP TO 11 METRES:BP20M_P23C_PLM
  • WORK EFFECTIVELY IN THE PLUMBING SERVICES SECTOR:BP20M_P23C_PLM
  • WORK SAFELY ON ROOFS:BP20M_P23C_PLM

  • 08:05 am - 11:55 am
    Week(s): 42
    October: 16

    Location:
  • B2.M07 SP Classroom
  • Modules:
  • CARRY OUT SIMPLE CONCRETING AND RENDERING:BP20M_P23C_PLM
  • INSTALL STORMWATER AND SUB-SOIL DRAINAGE SYSTEMS AND DRAIN WORK SITE:BP20M_P23C_PLM
  • INSTALL PREFABRICATED INSPECTION OPENINGS AND INSPECTION CHAMBERS:BP20M_P23C_PLM

  • 12:45 pm - 04:35 pm
    Week(s): 42
    October: 16

    Location:
  • B2.M07 SP Classroom
  • Modules:
  • CARRY OUT SIMPLE CONCRETING AND RENDERING:BP20M_P23C_PLM
  • INSTALL STORMWATER AND SUB-SOIL DRAINAGE SYSTEMS AND DRAIN WORK SITE:BP20M_P23C_PLM
  • INSTALL PREFABRICATED INSPECTION OPENINGS AND INSPECTION CHAMBERS:BP20M_P23C_PLM

  • 08:05 am - 04:35 pm
    Week(s): 48
    November: 27

    Location:
  • B2.G49 Computer Classroom
  • Modules:
  • INSTALL GAS PRESSURE CONTROL EQUIPMENT:BP20M_P23C_PLM
  • SIZE AND INSTALL CONSUMER GAS PIPING SYSTEMS:BP20M_P23C_PLM

  • 08:05 am - 04:35 pm
    Week(s): 50
    December: 11

    Location:
  • B2.M07 SP Classroom
  • Modules:
  • DESIGN DOMESTIC URBAN IRRIGATION SYSTEMS:BP20M_P23C_PLM
  • SET OUT, INSTALL AND COMMISSION IRRIGATION SYSTEMS:BP20M_P23C_PLM
  • INSTALL AND COMMISSION DOMESTIC IRRIGATION PUMPS:BP20M_P23C_PLM
  • INSTALL SEWERAGE PUMPSETS:BP20M_P23C_PLM
  • CONNECT AND INSTALL STORAGE TANKS TO A DOMESTIC WATER SUPPLY:BP20M_P23C_PLM

  • 08:05 am - 04:35 pm
    Week(s): 36
    September: 5

    Location:
  • B2.M07 SP Classroom
  • Modules:
  • WORK SAFELY AT HEIGHTS:BP20M_P23C_PLM
  • OPERATE ELEVATED WORK PLATFORMS UP TO 11 METRES:BP20M_P23C_PLM
  • WORK EFFECTIVELY IN THE PLUMBING SERVICES SECTOR:BP20M_P23C_PLM
  • WORK SAFELY ON ROOFS:BP20M_P23C_PLM

  • 08:05 am - 04:35 pm
    Week(s): 42
    October: 17

    Location:
  • B2.M07 SP Classroom
  • Modules:
  • CARRY OUT SIMPLE CONCRETING AND RENDERING:BP20M_P23C_PLM
  • INSTALL STORMWATER AND SUB-SOIL DRAINAGE SYSTEMS AND DRAIN WORK SITE:BP20M_P23C_PLM
  • INSTALL PREFABRICATED INSPECTION OPENINGS AND INSPECTION CHAMBERS:BP20M_P23C_PLM

  • 08:05 am - 04:35 pm
    Week(s): 46
    November: 14

    Location:
  • B2.M07 SP Classroom
  • Modules:
  • COLLECT AND STORE ROOF WATER:BP20M_P23C_PLM
  • INSTALL WATER PUMPSETS:BP20M_P23C_PLM
  • INSTALL BACKFLOW PREVENTION DEVICES:BP20M_P23C_PLM

  • 08:05 am - 04:35 pm
    Week(s): 48
    November: 28

    Location:
  • B2.G49 Computer Classroom
  • Modules:
  • INSTALL GAS PRESSURE CONTROL EQUIPMENT:BP20M_P23C_PLM
  • SIZE AND INSTALL CONSUMER GAS PIPING SYSTEMS:BP20M_P23C_PLM

  • 08:05 am - 04:35 pm
    Week(s): 50
    December: 12

    Location:
  • B2.M07 SP Classroom
  • Modules:
  • DESIGN DOMESTIC URBAN IRRIGATION SYSTEMS:BP20M_P23C_PLM
  • SET OUT, INSTALL AND COMMISSION IRRIGATION SYSTEMS:BP20M_P23C_PLM
  • INSTALL AND COMMISSION DOMESTIC IRRIGATION PUMPS:BP20M_P23C_PLM
  • INSTALL SEWERAGE PUMPSETS:BP20M_P23C_PLM
  • CONNECT AND INSTALL STORAGE TANKS TO A DOMESTIC WATER SUPPLY:BP20M_P23C_PLM

  • 08:05 am - 04:35 pm
    Week(s): 46
    November: 15

    Location:
  • B2.M07 SP Classroom
  • Modules:
  • COLLECT AND STORE ROOF WATER:BP20M_P23C_PLM
  • INSTALL WATER PUMPSETS:BP20M_P23C_PLM
  • INSTALL BACKFLOW PREVENTION DEVICES:BP20M_P23C_PLM

  • 08:05 am - 04:35 pm
    Week(s): 48
    November: 29

    Location:
  • B2.G49 Computer Classroom
  • Modules:
  • INSTALL GAS PRESSURE CONTROL EQUIPMENT:BP20M_P23C_PLM
  • SIZE AND INSTALL CONSUMER GAS PIPING SYSTEMS:BP20M_P23C_PLM

  • 08:05 am - 04:35 pm
    Week(s): 50
    December: 13

    Location:
  • B2.M07 SP Classroom
  • Modules:
  • DESIGN DOMESTIC URBAN IRRIGATION SYSTEMS:BP20M_P23C_PLM
  • SET OUT, INSTALL AND COMMISSION IRRIGATION SYSTEMS:BP20M_P23C_PLM
  • INSTALL AND COMMISSION DOMESTIC IRRIGATION PUMPS:BP20M_P23C_PLM
  • INSTALL SEWERAGE PUMPSETS:BP20M_P23C_PLM
  • CONNECT AND INSTALL STORAGE TANKS TO A DOMESTIC WATER SUPPLY:BP20M_P23C_PLM