Timetables

BP20M_P24A_PLM_GRP

Note: Timetables are subject to change; re-visit StudentWeb for the most up-to-date information.

Semester 2

Monday Tuesday Wednesday Thursday Friday Saturday Sunday
08:05 am - 04:35 pm
Week(s): 29
July: 15

Location:
  • B2.M07 SP Classroom
  • Modules:
  • FABRICATE AND INSTALL NON-FERROUS PRESSURE PIPING:BP20M_P24A_PLM
  • INSTALL PROPERTY SERVICE:BP20M_P24A_PLM

  • 08:05 am - 04:35 pm
    Week(s): 33
    August: 12

    Location:
  • B2.M07 SP Classroom
  • Modules:
  • SET OUT AND INSTALL WATER SERVICES:BP20M_P24A_PLM
  • INSTALL AND MAINTAIN DOMESTIC WATER TREATMENT EQUIPMENT:BP20M_P24A_PLM

  • 08:05 am - 04:35 pm
    Week(s): 43
    October: 21

    Location:
  • B2.M07 SP Classroom
  • Modules:
  • CARRY OUT SIMPLE CONCRETING AND RENDERING:BP20M_P24A_PLM
  • INSTALL STORMWATER AND SUB-SOIL DRAINAGE SYSTEMS AND DRAIN WORK SITE:BP20M_P24A_PLM
  • INSTALL PREFABRICATED INSPECTION OPENINGS AND INSPECTION CHAMBERS:BP20M_P24A_PLM

  • 08:05 am - 04:35 pm
    Week(s): 47
    November: 18

    Location:
  • B2.M07 SP Classroom
  • Modules:
  • INSTALL GAS PRESSURE CONTROL EQUIPMENT:BP20M_P24A_PLM
  • SIZE AND INSTALL CONSUMER GAS PIPING SYSTEMS:BP20M_P24A_PLM
  • SELECT AND FIT INSULATION AND SHEATHING:BP20M_P24A_PLM
  • INSTALL SMALL BORE HEATING SYSTEMS:BP20M_P24A_PLM
  • MAINTAIN MECHANICAL SERVICES EQUIPMENT:BP20M_P24A_PLM

  • 08:05 am - 04:35 pm
    Week(s): 29
    July: 16

    Location:
  • B2.M07 SP Classroom
  • Modules:
  • FABRICATE AND INSTALL NON-FERROUS PRESSURE PIPING:BP20M_P24A_PLM
  • INSTALL PROPERTY SERVICE:BP20M_P24A_PLM

  • 08:05 am - 04:35 pm
    Week(s): 33
    August: 13

    Location:
  • B2.M07 SP Classroom
  • Modules:
  • SET OUT AND INSTALL WATER SERVICES:BP20M_P24A_PLM
  • INSTALL AND MAINTAIN DOMESTIC WATER TREATMENT EQUIPMENT:BP20M_P24A_PLM

  • 08:05 am - 04:35 pm
    Week(s): 43
    October: 22

    Location:
  • B2.M07 SP Classroom
  • Modules:
  • CARRY OUT SIMPLE CONCRETING AND RENDERING:BP20M_P24A_PLM
  • INSTALL STORMWATER AND SUB-SOIL DRAINAGE SYSTEMS AND DRAIN WORK SITE:BP20M_P24A_PLM
  • INSTALL PREFABRICATED INSPECTION OPENINGS AND INSPECTION CHAMBERS:BP20M_P24A_PLM

  • 08:05 am - 04:35 pm
    Week(s): 47
    November: 19

    Location:
  • B2.M07 SP Classroom
  • Modules:
  • INSTALL GAS PRESSURE CONTROL EQUIPMENT:BP20M_P24A_PLM
  • SIZE AND INSTALL CONSUMER GAS PIPING SYSTEMS:BP20M_P24A_PLM
  • SELECT AND FIT INSULATION AND SHEATHING:BP20M_P24A_PLM
  • INSTALL SMALL BORE HEATING SYSTEMS:BP20M_P24A_PLM
  • MAINTAIN MECHANICAL SERVICES EQUIPMENT:BP20M_P24A_PLM

  • 08:05 am - 04:35 pm
    Week(s): 29
    July: 17

    Location:
  • B2.M07 SP Classroom
  • Modules:
  • FABRICATE AND INSTALL NON-FERROUS PRESSURE PIPING:BP20M_P24A_PLM
  • INSTALL PROPERTY SERVICE:BP20M_P24A_PLM

  • 08:05 am - 11:55 am
    Week(s): 33
    August: 14

    Location:
  • B2.M07 SP Classroom
  • Modules:
  • SET OUT AND INSTALL WATER SERVICES:BP20M_P24A_PLM
  • INSTALL AND MAINTAIN DOMESTIC WATER TREATMENT EQUIPMENT:BP20M_P24A_PLM

  • 12:45 pm - 04:35 pm
    Week(s): 33
    August: 14

    Location:
  • B2.M07 SP Classroom
  • Modules:
  • SET OUT AND INSTALL WATER SERVICES:BP20M_P24A_PLM
  • INSTALL AND MAINTAIN DOMESTIC WATER TREATMENT EQUIPMENT:BP20M_P24A_PLM

  • 08:05 am - 11:55 am
    Week(s): 43
    October: 23

    Location:
  • B2.M07 SP Classroom
  • Modules:
  • CARRY OUT SIMPLE CONCRETING AND RENDERING:BP20M_P24A_PLM
  • INSTALL STORMWATER AND SUB-SOIL DRAINAGE SYSTEMS AND DRAIN WORK SITE:BP20M_P24A_PLM
  • INSTALL PREFABRICATED INSPECTION OPENINGS AND INSPECTION CHAMBERS:BP20M_P24A_PLM

  • 12:45 pm - 04:35 pm
    Week(s): 43
    October: 23

    Location:
  • B2.M07 SP Classroom
  • Modules:
  • CARRY OUT SIMPLE CONCRETING AND RENDERING:BP20M_P24A_PLM
  • INSTALL STORMWATER AND SUB-SOIL DRAINAGE SYSTEMS AND DRAIN WORK SITE:BP20M_P24A_PLM
  • INSTALL PREFABRICATED INSPECTION OPENINGS AND INSPECTION CHAMBERS:BP20M_P24A_PLM

  • 08:05 am - 04:35 pm
    Week(s): 47
    November: 20

    Location:
  • B2.M07 SP Classroom
  • Modules:
  • INSTALL GAS PRESSURE CONTROL EQUIPMENT:BP20M_P24A_PLM
  • SIZE AND INSTALL CONSUMER GAS PIPING SYSTEMS:BP20M_P24A_PLM
  • SELECT AND FIT INSULATION AND SHEATHING:BP20M_P24A_PLM
  • INSTALL SMALL BORE HEATING SYSTEMS:BP20M_P24A_PLM
  • MAINTAIN MECHANICAL SERVICES EQUIPMENT:BP20M_P24A_PLM

  • 08:05 am - 04:35 pm
    Week(s): 29
    July: 18

    Location:
  • B2.M07 SP Classroom
  • Modules:
  • FABRICATE AND INSTALL NON-FERROUS PRESSURE PIPING:BP20M_P24A_PLM
  • INSTALL PROPERTY SERVICE:BP20M_P24A_PLM

  • 08:05 am - 04:35 pm
    Week(s): 33
    August: 15

    Location:
  • B2.M07 SP Classroom
  • Modules:
  • SET OUT AND INSTALL WATER SERVICES:BP20M_P24A_PLM
  • INSTALL AND MAINTAIN DOMESTIC WATER TREATMENT EQUIPMENT:BP20M_P24A_PLM

  • 08:05 am - 04:35 pm
    Week(s): 37
    September: 12

    Location:
  • B2.M07 SP Classroom
  • Modules:
  • WORK SAFELY AT HEIGHTS:BP20M_P24A_PLM
  • OPERATE ELEVATED WORK PLATFORMS UP TO 11 METRES:BP20M_P24A_PLM
  • WORK EFFECTIVELY IN THE PLUMBING SERVICES SECTOR:BP20M_P24A_PLM
  • WORK SAFELY ON ROOFS:BP20M_P24A_PLM

  • 08:05 am - 04:35 pm
    Week(s): 43
    October: 24

    Location:
  • B2.M07 SP Classroom
  • Modules:
  • CARRY OUT SIMPLE CONCRETING AND RENDERING:BP20M_P24A_PLM
  • INSTALL STORMWATER AND SUB-SOIL DRAINAGE SYSTEMS AND DRAIN WORK SITE:BP20M_P24A_PLM
  • INSTALL PREFABRICATED INSPECTION OPENINGS AND INSPECTION CHAMBERS:BP20M_P24A_PLM

  • 08:05 am - 04:35 pm
    Week(s): 47
    November: 21

    Location:
  • B2.M07 SP Classroom
  • Modules:
  • INSTALL GAS PRESSURE CONTROL EQUIPMENT:BP20M_P24A_PLM
  • SIZE AND INSTALL CONSUMER GAS PIPING SYSTEMS:BP20M_P24A_PLM
  • SELECT AND FIT INSULATION AND SHEATHING:BP20M_P24A_PLM
  • INSTALL SMALL BORE HEATING SYSTEMS:BP20M_P24A_PLM
  • MAINTAIN MECHANICAL SERVICES EQUIPMENT:BP20M_P24A_PLM

  • 08:05 am - 04:35 pm
    Week(s): 29
    July: 19

    Location:
  • B2.M07 SP Classroom
  • Modules:
  • FABRICATE AND INSTALL NON-FERROUS PRESSURE PIPING:BP20M_P24A_PLM
  • INSTALL PROPERTY SERVICE:BP20M_P24A_PLM

  • 08:05 am - 04:35 pm
    Week(s): 33
    August: 16

    Location:
  • B2.M07 SP Classroom
  • Modules:
  • SET OUT AND INSTALL WATER SERVICES:BP20M_P24A_PLM
  • INSTALL AND MAINTAIN DOMESTIC WATER TREATMENT EQUIPMENT:BP20M_P24A_PLM

  • 08:05 am - 04:35 pm
    Week(s): 37
    September: 13

    Location:
  • B2.M07 SP Classroom
  • Modules:
  • WORK SAFELY AT HEIGHTS:BP20M_P24A_PLM
  • OPERATE ELEVATED WORK PLATFORMS UP TO 11 METRES:BP20M_P24A_PLM
  • WORK EFFECTIVELY IN THE PLUMBING SERVICES SECTOR:BP20M_P24A_PLM
  • WORK SAFELY ON ROOFS:BP20M_P24A_PLM