Lilydale Campus Driveway

Lilydale Campus Driveway

by Student Life -
Number of replies: 0

Starting from 8th July 2022  the Lilydale campus driveway (Melba Ave and Jarlo Dr) will be shared with construction vehicles.

Students will be impacted between 7am to 5pm Monday – Friday  and 7am –1pm Saturday. 

This is due to the Maroondah Highway Level Crossing Removal Project.

There will be a Traffic Controller and signage at the carpark entry to manage pedestrians, cyclists and vehicles.

 Works are estimated to take between 6-8 weeks. 

What does this mean for Lilydale students?

  • There may be minor delays while entering or exiting the campus due to construction works.
  • Detours will be in place to safely guide footpath users around work sites. 
  • There may be construction noise and activity such as vehicles/equipment operating