Timetables

P8B_PLM_GRP

Note: Timetables are subject to change; re-visit StudentWeb for the most up-to-date information.

Semester 2

Monday Tuesday Wednesday Thursday Friday Saturday Sunday
08:05 am - 04:35 pm
Week(s): 29
July: 15

Location:
  • E2.M10 (through w/shop)
  • Modules:
  • LOCATE AND CLEAR BLOCKAGES:P8B_PLM
  • INSTALL DOMESTIC TREATMENT PLANTS:P8B_PLM
  • MAINTAIN EFFLUENT DISINFECTION SYSTEMS:P8B_PLM
  • INSTALL ON-SITE DISPOSAL SYSTEMS:P8B_PLM

  • 08:05 am - 04:35 pm
    Week(s): 33
    August: 12

    Location:
  • E2.M10 (through w/shop)
  • Modules:
  • INSTALL AND COMMISSION WATER HEATING SYSTEMS:P8B_PLM

  • 08:05 am - 04:35 pm
    Week(s): 37
    September: 9

    Location:
  • E2.M10 (through w/shop)
  • Modules:
  • COLLECT AND STORE ROOF WATER:P8B_PLM
  • INSTALL WATER PUMPSETS:P8B_PLM

  • 08:05 am - 04:35 pm
    Week(s): 44
    October: 28

    Location:
  • E7.111 Tech. Classroom
  • E7.G08a
  • Modules:
  • INSTALL AND TEST SPLIT SYSTEM AIR CONDITIONING:P8B_PLM
  • POSITION, ASSEMBLE AND START UP SINGLE HEAD SPLIT AIR CONDITIONING AND WATER HEATING HEAT PUMP SYSTEMS:P8B_PLM
  • RECOVER, PRESSURE TEST, EVACUATE, CHARGE AND LEAK TEST REFRIGERANTS - SPLIT SYSTEMS:P8B_PLM

  • 08:05 am - 04:35 pm
    Week(s): 47
    November: 18

    Location:
  • E2.M10 (through w/shop)
  • Modules:
  • INSTALL SEWERAGE PUMPSETS:P8B_PLM

  • 08:05 am - 04:35 pm
    Week(s): 29
    July: 16

    Location:
  • E2.M10 (through w/shop)
  • Modules:
  • LOCATE AND CLEAR BLOCKAGES:P8B_PLM
  • INSTALL DOMESTIC TREATMENT PLANTS:P8B_PLM
  • MAINTAIN EFFLUENT DISINFECTION SYSTEMS:P8B_PLM
  • INSTALL ON-SITE DISPOSAL SYSTEMS:P8B_PLM

  • 08:05 am - 04:35 pm
    Week(s): 33
    August: 13

    Location:
  • E2.M10 (through w/shop)
  • Modules:
  • INSTALL AND COMMISSION WATER HEATING SYSTEMS:P8B_PLM

  • 08:05 am - 04:35 pm
    Week(s): 37
    September: 10

    Location:
  • E2.M10 (through w/shop)
  • Modules:
  • COLLECT AND STORE ROOF WATER:P8B_PLM
  • INSTALL WATER PUMPSETS:P8B_PLM

  • 08:05 am - 04:35 pm
    Week(s): 44
    October: 29

    Location:
  • E7.111 Tech. Classroom
  • E7.G08a
  • Modules:
  • INSTALL AND TEST SPLIT SYSTEM AIR CONDITIONING:P8B_PLM
  • POSITION, ASSEMBLE AND START UP SINGLE HEAD SPLIT AIR CONDITIONING AND WATER HEATING HEAT PUMP SYSTEMS:P8B_PLM
  • RECOVER, PRESSURE TEST, EVACUATE, CHARGE AND LEAK TEST REFRIGERANTS - SPLIT SYSTEMS:P8B_PLM

  • 08:05 am - 04:35 pm
    Week(s): 47
    November: 19

    Location:
  • E2.M10 (through w/shop)
  • Modules:
  • INSTALL SEWERAGE PUMPSETS:P8B_PLM

  • 08:05 am - 04:35 pm
    Week(s): 29
    July: 17

    Location:
  • E2.M10 (through w/shop)
  • Modules:
  • LOCATE AND CLEAR BLOCKAGES:P8B_PLM
  • INSTALL DOMESTIC TREATMENT PLANTS:P8B_PLM
  • MAINTAIN EFFLUENT DISINFECTION SYSTEMS:P8B_PLM
  • INSTALL ON-SITE DISPOSAL SYSTEMS:P8B_PLM

  • 08:05 am - 04:35 pm
    Week(s): 33
    August: 14

    Location:
  • E2.M10 (through w/shop)
  • Modules:
  • INSTALL AND COMMISSION WATER HEATING SYSTEMS:P8B_PLM

  • 08:05 am - 04:35 pm
    Week(s): 37
    September: 11

    Location:
  • E2.M10 (through w/shop)
  • Modules:
  • COLLECT AND STORE ROOF WATER:P8B_PLM
  • INSTALL WATER PUMPSETS:P8B_PLM

  • 08:05 am - 04:35 pm
    Week(s): 44
    October: 30

    Location:
  • E7.111 Tech. Classroom
  • E7.G08a
  • Modules:
  • INSTALL AND TEST SPLIT SYSTEM AIR CONDITIONING:P8B_PLM
  • POSITION, ASSEMBLE AND START UP SINGLE HEAD SPLIT AIR CONDITIONING AND WATER HEATING HEAT PUMP SYSTEMS:P8B_PLM
  • RECOVER, PRESSURE TEST, EVACUATE, CHARGE AND LEAK TEST REFRIGERANTS - SPLIT SYSTEMS:P8B_PLM

  • 08:05 am - 04:35 pm
    Week(s): 47
    November: 20

    Location:
  • E2.M10 (through w/shop)
  • Modules:
  • INSTALL SEWERAGE PUMPSETS:P8B_PLM

  • 08:05 am - 04:35 pm
    Week(s): 29
    July: 18

    Location:
  • E2.M10 (through w/shop)
  • Modules:
  • LOCATE AND CLEAR BLOCKAGES:P8B_PLM
  • INSTALL DOMESTIC TREATMENT PLANTS:P8B_PLM
  • MAINTAIN EFFLUENT DISINFECTION SYSTEMS:P8B_PLM
  • INSTALL ON-SITE DISPOSAL SYSTEMS:P8B_PLM

  • 08:05 am - 04:35 pm
    Week(s): 33
    August: 15

    Location:
  • E2.M10 (through w/shop)
  • Modules:
  • INSTALL AND COMMISSION WATER HEATING SYSTEMS:P8B_PLM

  • 08:05 am - 04:35 pm
    Week(s): 37
    September: 12

    Location:
  • E2.M10 (through w/shop)
  • Modules:
  • COLLECT AND STORE ROOF WATER:P8B_PLM
  • INSTALL WATER PUMPSETS:P8B_PLM

  • 08:05 am - 04:35 pm
    Week(s): 44
    October: 31

    Location:
  • E7.111 Tech. Classroom
  • E7.G08a
  • Modules:
  • INSTALL AND TEST SPLIT SYSTEM AIR CONDITIONING:P8B_PLM
  • POSITION, ASSEMBLE AND START UP SINGLE HEAD SPLIT AIR CONDITIONING AND WATER HEATING HEAT PUMP SYSTEMS:P8B_PLM
  • RECOVER, PRESSURE TEST, EVACUATE, CHARGE AND LEAK TEST REFRIGERANTS - SPLIT SYSTEMS:P8B_PLM

  • 08:05 am - 04:35 pm
    Week(s): 47
    November: 21

    Location:
  • E2.M10 (through w/shop)
  • Modules:
  • INSTALL SEWERAGE PUMPSETS:P8B_PLM

  • 08:05 am - 04:35 pm
    Week(s): 29
    July: 19

    Location:
  • E2.M10 (through w/shop)
  • Modules:
  • LOCATE AND CLEAR BLOCKAGES:P8B_PLM
  • INSTALL DOMESTIC TREATMENT PLANTS:P8B_PLM
  • MAINTAIN EFFLUENT DISINFECTION SYSTEMS:P8B_PLM
  • INSTALL ON-SITE DISPOSAL SYSTEMS:P8B_PLM

  • 08:05 am - 04:35 pm
    Week(s): 33
    August: 16

    Location:
  • E2.M10 (through w/shop)
  • Modules:
  • INSTALL AND COMMISSION WATER HEATING SYSTEMS:P8B_PLM

  • 08:05 am - 04:35 pm
    Week(s): 37
    September: 13

    Location:
  • E2.M10 (through w/shop)
  • Modules:
  • COLLECT AND STORE ROOF WATER:P8B_PLM
  • INSTALL WATER PUMPSETS:P8B_PLM

  • 08:05 am - 04:35 pm
    Week(s): 44
    October: 32

    Location:
  • E7.115 Elec. Tech. Classroom
  • E7.G08a
  • Modules:
  • INSTALL AND TEST SPLIT SYSTEM AIR CONDITIONING:P8B_PLM
  • POSITION, ASSEMBLE AND START UP SINGLE HEAD SPLIT AIR CONDITIONING AND WATER HEATING HEAT PUMP SYSTEMS:P8B_PLM
  • RECOVER, PRESSURE TEST, EVACUATE, CHARGE AND LEAK TEST REFRIGERANTS - SPLIT SYSTEMS:P8B_PLM

  • 08:05 am - 04:35 pm
    Week(s): 47
    November: 22

    Location:
  • E2.M10 (through w/shop)
  • Modules:
  • INSTALL SEWERAGE PUMPSETS:P8B_PLM