Timetables

P8D_PLM_GRP

Note: Timetables are subject to change; re-visit StudentWeb for the most up-to-date information.

Semester 2

Monday Tuesday Wednesday Thursday Friday Saturday Sunday
08:05 am - 04:35 pm
Week(s): 30
July: 22

Location:
  • E2.M02 (through w/shop)
  • Modules:
  • ERECT AND DISMANTLE RESTRICTED HEIGHT SCAFFOLDING:P8D_PLM
  • CALCULATE AND INSTALL NATURAL VENTILATION FOR TYPE A GAS APPLIANCES:P8D_PLM
  • SIZE CONSUMER GAS PIPING SYSTEMS:P8D_PLM

  • 08:05 am - 04:35 pm
    Week(s): 34
    August: 19

    Location:
  • E2.M10 (through w/shop)
  • Modules:
  • WELD POLYETHYLENE AND POLYPROPYLENE PIPES USING FUSION METHOD:P8D_PLM
  • SET OUT AND INSTALL WATER SERVICES:P8D_PLM
  • INSTALL AND MAINTAIN DOMESTIC WATER TREATMENT EQUIPMENT:P8D_PLM

  • 08:05 am - 04:35 pm
    Week(s): 38
    September: 16

    Location:
  • E2.M10 (through w/shop)
  • Modules:
  • INSTALL STORMWATER AND SUB-SOIL DRAINAGE SYSTEMS:P8D_PLM
  • DRAIN WORK SITE:P8D_PLM
  • INSTALL PREFABRICATED INSPECTION OPENINGS AND ENCLOSURES:P8D_PLM
  • DESIGN DOMESTIC URBAN IRRIGATION SYSTEMS:P8D_PLM
  • SET OUT, INSTALL AND COMMISSION IRRIGATION SYSTEMS:P8D_PLM
  • INSTALL AND COMMISSION DOMESTIC IRRIGATION PUMPS:P8D_PLM
  • CONNECT IRRIGATION SYSTEMS FROM DRINKING WATER SUPPLY:P8D_PLM

  • 08:05 am - 04:35 pm
    Week(s): 44
    October: 28

    Location:
  • E2.M10 (through w/shop)
  • Modules:
  • FABRICATE ROOF COVERINGS FOR CURVED STRUCTURES:P8D_PLM
  • FABRICATE AND INSTALL ROOF DRAINAGE COMPONENTS:P8D_PLM
  • INSTALL ROOF COVERINGS TO CURVED ROOF STRUCTURES:P8D_PLM

  • 08:05 am - 04:35 pm
    Week(s): 48
    November: 25

    Location:
  • E2.M10 (through w/shop)
  • Modules:
  • SELECT AND INSTALL ROOF SHEETING AND WALL CLADDING:P8D_PLM
  • FABRICATE AND INSTALL EXTERNAL FLASHINGS:P8D_PLM

  • 08:05 am - 04:35 pm
    Week(s): 30
    July: 23

    Location:
  • E2.M02 (through w/shop)
  • Modules:
  • ERECT AND DISMANTLE RESTRICTED HEIGHT SCAFFOLDING:P8D_PLM
  • CALCULATE AND INSTALL NATURAL VENTILATION FOR TYPE A GAS APPLIANCES:P8D_PLM
  • SIZE CONSUMER GAS PIPING SYSTEMS:P8D_PLM

  • 08:05 am - 04:35 pm
    Week(s): 34
    August: 20

    Location:
  • E2.M10 (through w/shop)
  • Modules:
  • WELD POLYETHYLENE AND POLYPROPYLENE PIPES USING FUSION METHOD:P8D_PLM
  • SET OUT AND INSTALL WATER SERVICES:P8D_PLM
  • INSTALL AND MAINTAIN DOMESTIC WATER TREATMENT EQUIPMENT:P8D_PLM

  • 08:05 am - 04:35 pm
    Week(s): 38
    September: 17

    Location:
  • E2.M10 (through w/shop)
  • Modules:
  • INSTALL STORMWATER AND SUB-SOIL DRAINAGE SYSTEMS:P8D_PLM
  • DRAIN WORK SITE:P8D_PLM
  • INSTALL PREFABRICATED INSPECTION OPENINGS AND ENCLOSURES:P8D_PLM
  • DESIGN DOMESTIC URBAN IRRIGATION SYSTEMS:P8D_PLM
  • SET OUT, INSTALL AND COMMISSION IRRIGATION SYSTEMS:P8D_PLM
  • INSTALL AND COMMISSION DOMESTIC IRRIGATION PUMPS:P8D_PLM
  • CONNECT IRRIGATION SYSTEMS FROM DRINKING WATER SUPPLY:P8D_PLM

  • 08:05 am - 04:35 pm
    Week(s): 44
    October: 29

    Location:
  • E2.M10 (through w/shop)
  • Modules:
  • FABRICATE ROOF COVERINGS FOR CURVED STRUCTURES:P8D_PLM
  • FABRICATE AND INSTALL ROOF DRAINAGE COMPONENTS:P8D_PLM
  • INSTALL ROOF COVERINGS TO CURVED ROOF STRUCTURES:P8D_PLM

  • 08:05 am - 04:35 pm
    Week(s): 48
    November: 26

    Location:
  • E2.M10 (through w/shop)
  • Modules:
  • SELECT AND INSTALL ROOF SHEETING AND WALL CLADDING:P8D_PLM
  • FABRICATE AND INSTALL EXTERNAL FLASHINGS:P8D_PLM

  • 08:05 am - 04:35 pm
    Week(s): 30
    July: 24

    Location:
  • E2.M02 (through w/shop)
  • Modules:
  • ERECT AND DISMANTLE RESTRICTED HEIGHT SCAFFOLDING:P8D_PLM
  • CALCULATE AND INSTALL NATURAL VENTILATION FOR TYPE A GAS APPLIANCES:P8D_PLM
  • SIZE CONSUMER GAS PIPING SYSTEMS:P8D_PLM

  • 08:05 am - 04:35 pm
    Week(s): 34
    August: 21

    Location:
  • E2.M10 (through w/shop)
  • Modules:
  • WELD POLYETHYLENE AND POLYPROPYLENE PIPES USING FUSION METHOD:P8D_PLM
  • SET OUT AND INSTALL WATER SERVICES:P8D_PLM
  • INSTALL AND MAINTAIN DOMESTIC WATER TREATMENT EQUIPMENT:P8D_PLM

  • 08:05 am - 04:35 pm
    Week(s): 38
    September: 18

    Location:
  • E2.M10 (through w/shop)
  • Modules:
  • INSTALL STORMWATER AND SUB-SOIL DRAINAGE SYSTEMS:P8D_PLM
  • DRAIN WORK SITE:P8D_PLM
  • INSTALL PREFABRICATED INSPECTION OPENINGS AND ENCLOSURES:P8D_PLM
  • DESIGN DOMESTIC URBAN IRRIGATION SYSTEMS:P8D_PLM
  • SET OUT, INSTALL AND COMMISSION IRRIGATION SYSTEMS:P8D_PLM
  • INSTALL AND COMMISSION DOMESTIC IRRIGATION PUMPS:P8D_PLM
  • CONNECT IRRIGATION SYSTEMS FROM DRINKING WATER SUPPLY:P8D_PLM

  • 08:05 am - 04:35 pm
    Week(s): 44
    October: 30

    Location:
  • E2.M10 (through w/shop)
  • Modules:
  • FABRICATE ROOF COVERINGS FOR CURVED STRUCTURES:P8D_PLM
  • FABRICATE AND INSTALL ROOF DRAINAGE COMPONENTS:P8D_PLM
  • INSTALL ROOF COVERINGS TO CURVED ROOF STRUCTURES:P8D_PLM

  • 08:05 am - 04:35 pm
    Week(s): 48
    November: 27

    Location:
  • E2.M10 (through w/shop)
  • Modules:
  • SELECT AND INSTALL ROOF SHEETING AND WALL CLADDING:P8D_PLM
  • FABRICATE AND INSTALL EXTERNAL FLASHINGS:P8D_PLM

  • 08:05 am - 04:35 pm
    Week(s): 30
    July: 25

    Location:
  • E2.M02 (through w/shop)
  • Modules:
  • ERECT AND DISMANTLE RESTRICTED HEIGHT SCAFFOLDING:P8D_PLM
  • CALCULATE AND INSTALL NATURAL VENTILATION FOR TYPE A GAS APPLIANCES:P8D_PLM
  • SIZE CONSUMER GAS PIPING SYSTEMS:P8D_PLM

  • 08:05 am - 04:35 pm
    Week(s): 34
    August: 22

    Location:
  • E2.M10 (through w/shop)
  • Modules:
  • WELD POLYETHYLENE AND POLYPROPYLENE PIPES USING FUSION METHOD:P8D_PLM
  • SET OUT AND INSTALL WATER SERVICES:P8D_PLM
  • INSTALL AND MAINTAIN DOMESTIC WATER TREATMENT EQUIPMENT:P8D_PLM

  • 08:05 am - 04:35 pm
    Week(s): 44
    October: 31

    Location:
  • E2.M10 (through w/shop)
  • Modules:
  • FABRICATE ROOF COVERINGS FOR CURVED STRUCTURES:P8D_PLM
  • FABRICATE AND INSTALL ROOF DRAINAGE COMPONENTS:P8D_PLM
  • INSTALL ROOF COVERINGS TO CURVED ROOF STRUCTURES:P8D_PLM

  • 08:05 am - 04:35 pm
    Week(s): 48
    November: 28

    Location:
  • E2.M10 (through w/shop)
  • Modules:
  • SELECT AND INSTALL ROOF SHEETING AND WALL CLADDING:P8D_PLM
  • FABRICATE AND INSTALL EXTERNAL FLASHINGS:P8D_PLM

  • 08:05 am - 04:35 pm
    Week(s): 30
    July: 26

    Location:
  • E2.M02 (through w/shop)
  • Modules:
  • ERECT AND DISMANTLE RESTRICTED HEIGHT SCAFFOLDING:P8D_PLM
  • CALCULATE AND INSTALL NATURAL VENTILATION FOR TYPE A GAS APPLIANCES:P8D_PLM
  • SIZE CONSUMER GAS PIPING SYSTEMS:P8D_PLM

  • 08:05 am - 04:35 pm
    Week(s): 34
    August: 23

    Location:
  • E2.M10 (through w/shop)
  • Modules:
  • WELD POLYETHYLENE AND POLYPROPYLENE PIPES USING FUSION METHOD:P8D_PLM
  • SET OUT AND INSTALL WATER SERVICES:P8D_PLM
  • INSTALL AND MAINTAIN DOMESTIC WATER TREATMENT EQUIPMENT:P8D_PLM

  • 08:05 am - 04:35 pm
    Week(s): 38
    September: 20

    Location:
  • E2.M10 (through w/shop)
  • Modules:
  • INSTALL STORMWATER AND SUB-SOIL DRAINAGE SYSTEMS:P8D_PLM
  • DRAIN WORK SITE:P8D_PLM
  • INSTALL PREFABRICATED INSPECTION OPENINGS AND ENCLOSURES:P8D_PLM
  • DESIGN DOMESTIC URBAN IRRIGATION SYSTEMS:P8D_PLM
  • SET OUT, INSTALL AND COMMISSION IRRIGATION SYSTEMS:P8D_PLM
  • INSTALL AND COMMISSION DOMESTIC IRRIGATION PUMPS:P8D_PLM
  • CONNECT IRRIGATION SYSTEMS FROM DRINKING WATER SUPPLY:P8D_PLM

  • 08:05 am - 04:35 pm
    Week(s): 44
    October: 32

    Location:
  • E2.M10 (through w/shop)
  • Modules:
  • FABRICATE ROOF COVERINGS FOR CURVED STRUCTURES:P8D_PLM
  • FABRICATE AND INSTALL ROOF DRAINAGE COMPONENTS:P8D_PLM
  • INSTALL ROOF COVERINGS TO CURVED ROOF STRUCTURES:P8D_PLM

  • 08:05 am - 04:35 pm
    Week(s): 48
    November: 29

    Location:
  • E2.M10 (through w/shop)
  • Modules:
  • SELECT AND INSTALL ROOF SHEETING AND WALL CLADDING:P8D_PLM
  • FABRICATE AND INSTALL EXTERNAL FLASHINGS:P8D_PLM