Timetables

P8E_PLM_GRP

Note: Timetables are subject to change; re-visit StudentWeb for the most up-to-date information.

Semester 2

Monday Tuesday Wednesday Thursday Friday Saturday Sunday
08:05 am - 04:35 pm
Week(s): 31
July: 29

Location:
  • E2.M10 (through w/shop)
  • Modules:
  • WORK SAFELY AT HEIGHTS:P8E_PLM
  • OPERATE ELEVATED WORK PLATFORMS:P8E_PLM
  • WORK SAFELY ON ROOFS:P8E_PLM

  • 08:05 am - 04:35 pm
    Week(s): 35
    August: 26

    Location:
  • E2.M05 (through w/shop)
  • Modules:
  • FLASH PENETRATIONS THROUGH ROOFS AND WALLS:P8E_PLM
  • INSTALL AIR CONDITIONING CONTROL EQUIPMENT:P8E_PLM
  • INSTALL AND MAINTAIN EVAPORATIVE AIR COOLING SYSTEMS:P8E_PLM

  • 08:05 am - 04:35 pm
    Week(s): 41
    October: 7

    Location:
  • E2.M05 (through w/shop)
  • Modules:
  • ERECT AND DISMANTLE RESTRICTED HEIGHT SCAFFOLDING:P8E_PLM
  • CALCULATE AND INSTALL NATURAL VENTILATION FOR TYPE A GAS APPLIANCES:P8E_PLM
  • SIZE CONSUMER GAS PIPING SYSTEMS:P8E_PLM

  • 08:05 am - 04:35 pm
    Week(s): 45
    November: 4

    Location:
  • E2.M10 (through w/shop)
  • Modules:
  • WELD POLYETHYLENE AND POLYPROPYLENE PIPES USING FUSION METHOD:P8E_PLM
  • SET OUT AND INSTALL WATER SERVICES:P8E_PLM
  • INSTALL AND MAINTAIN DOMESTIC WATER TREATMENT EQUIPMENT:P8E_PLM

  • 08:05 am - 04:35 pm
    Week(s): 49
    December: 2

    Location:
  • E2.M10 (through w/shop)
  • Modules:
  • INSTALL STORMWATER AND SUB-SOIL DRAINAGE SYSTEMS:P8E_PLM
  • DRAIN WORK SITE:P8E_PLM
  • INSTALL PREFABRICATED INSPECTION OPENINGS AND ENCLOSURES:P8E_PLM
  • DESIGN DOMESTIC URBAN IRRIGATION SYSTEMS:P8E_PLM
  • SET OUT, INSTALL AND COMMISSION IRRIGATION SYSTEMS:P8E_PLM
  • INSTALL AND COMMISSION DOMESTIC IRRIGATION PUMPS:P8E_PLM
  • CONNECT IRRIGATION SYSTEMS FROM DRINKING WATER SUPPLY:P8E_PLM

  • 08:05 am - 04:35 pm
    Week(s): 31
    July: 30

    Location:
  • E2.M10 (through w/shop)
  • Modules:
  • WORK SAFELY AT HEIGHTS:P8E_PLM
  • OPERATE ELEVATED WORK PLATFORMS:P8E_PLM
  • WORK SAFELY ON ROOFS:P8E_PLM

  • 08:05 am - 04:35 pm
    Week(s): 35
    August: 27

    Location:
  • E2.M05 (through w/shop)
  • Modules:
  • FLASH PENETRATIONS THROUGH ROOFS AND WALLS:P8E_PLM
  • INSTALL AIR CONDITIONING CONTROL EQUIPMENT:P8E_PLM
  • INSTALL AND MAINTAIN EVAPORATIVE AIR COOLING SYSTEMS:P8E_PLM

  • 08:05 am - 04:35 pm
    Week(s): 41
    October: 8

    Location:
  • E2.M05 (through w/shop)
  • Modules:
  • ERECT AND DISMANTLE RESTRICTED HEIGHT SCAFFOLDING:P8E_PLM
  • CALCULATE AND INSTALL NATURAL VENTILATION FOR TYPE A GAS APPLIANCES:P8E_PLM
  • SIZE CONSUMER GAS PIPING SYSTEMS:P8E_PLM

  • 08:05 am - 04:35 pm
    Week(s): 49
    December: 3

    Location:
  • E2.M10 (through w/shop)
  • Modules:
  • INSTALL STORMWATER AND SUB-SOIL DRAINAGE SYSTEMS:P8E_PLM
  • DRAIN WORK SITE:P8E_PLM
  • INSTALL PREFABRICATED INSPECTION OPENINGS AND ENCLOSURES:P8E_PLM
  • DESIGN DOMESTIC URBAN IRRIGATION SYSTEMS:P8E_PLM
  • SET OUT, INSTALL AND COMMISSION IRRIGATION SYSTEMS:P8E_PLM
  • INSTALL AND COMMISSION DOMESTIC IRRIGATION PUMPS:P8E_PLM
  • CONNECT IRRIGATION SYSTEMS FROM DRINKING WATER SUPPLY:P8E_PLM

  • 08:05 am - 04:35 pm
    Week(s): 31
    July: 31

    Location:
  • E2.M10 (through w/shop)
  • Modules:
  • WORK SAFELY AT HEIGHTS:P8E_PLM
  • OPERATE ELEVATED WORK PLATFORMS:P8E_PLM
  • WORK SAFELY ON ROOFS:P8E_PLM

  • 08:05 am - 04:35 pm
    Week(s): 35
    August: 28

    Location:
  • E2.M05 (through w/shop)
  • Modules:
  • FLASH PENETRATIONS THROUGH ROOFS AND WALLS:P8E_PLM
  • INSTALL AIR CONDITIONING CONTROL EQUIPMENT:P8E_PLM
  • INSTALL AND MAINTAIN EVAPORATIVE AIR COOLING SYSTEMS:P8E_PLM

  • 08:05 am - 04:35 pm
    Week(s): 41
    October: 9

    Location:
  • E2.M05 (through w/shop)
  • Modules:
  • ERECT AND DISMANTLE RESTRICTED HEIGHT SCAFFOLDING:P8E_PLM
  • CALCULATE AND INSTALL NATURAL VENTILATION FOR TYPE A GAS APPLIANCES:P8E_PLM
  • SIZE CONSUMER GAS PIPING SYSTEMS:P8E_PLM

  • 08:05 am - 04:35 pm
    Week(s): 45
    November: 6

    Location:
  • E2.M10 (through w/shop)
  • Modules:
  • WELD POLYETHYLENE AND POLYPROPYLENE PIPES USING FUSION METHOD:P8E_PLM
  • SET OUT AND INSTALL WATER SERVICES:P8E_PLM
  • INSTALL AND MAINTAIN DOMESTIC WATER TREATMENT EQUIPMENT:P8E_PLM

  • 08:05 am - 04:35 pm
    Week(s): 49
    December: 4

    Location:
  • E2.M10 (through w/shop)
  • Modules:
  • INSTALL STORMWATER AND SUB-SOIL DRAINAGE SYSTEMS:P8E_PLM
  • DRAIN WORK SITE:P8E_PLM
  • INSTALL PREFABRICATED INSPECTION OPENINGS AND ENCLOSURES:P8E_PLM
  • DESIGN DOMESTIC URBAN IRRIGATION SYSTEMS:P8E_PLM
  • SET OUT, INSTALL AND COMMISSION IRRIGATION SYSTEMS:P8E_PLM
  • INSTALL AND COMMISSION DOMESTIC IRRIGATION PUMPS:P8E_PLM
  • CONNECT IRRIGATION SYSTEMS FROM DRINKING WATER SUPPLY:P8E_PLM

  • 08:05 am - 04:35 pm
    Week(s): 31
    July: 32

    Location:
  • E2.M10 (through w/shop)
  • Modules:
  • WORK SAFELY AT HEIGHTS:P8E_PLM
  • OPERATE ELEVATED WORK PLATFORMS:P8E_PLM
  • WORK SAFELY ON ROOFS:P8E_PLM

  • 08:05 am - 04:35 pm
    Week(s): 35
    August: 29

    Location:
  • E2.M05 (through w/shop)
  • Modules:
  • FLASH PENETRATIONS THROUGH ROOFS AND WALLS:P8E_PLM
  • INSTALL AIR CONDITIONING CONTROL EQUIPMENT:P8E_PLM
  • INSTALL AND MAINTAIN EVAPORATIVE AIR COOLING SYSTEMS:P8E_PLM

  • 08:05 am - 04:35 pm
    Week(s): 41
    October: 10

    Location:
  • E2.M05 (through w/shop)
  • Modules:
  • ERECT AND DISMANTLE RESTRICTED HEIGHT SCAFFOLDING:P8E_PLM
  • CALCULATE AND INSTALL NATURAL VENTILATION FOR TYPE A GAS APPLIANCES:P8E_PLM
  • SIZE CONSUMER GAS PIPING SYSTEMS:P8E_PLM

  • 08:05 am - 04:35 pm
    Week(s): 45
    November: 7

    Location:
  • E2.M10 (through w/shop)
  • Modules:
  • WELD POLYETHYLENE AND POLYPROPYLENE PIPES USING FUSION METHOD:P8E_PLM
  • SET OUT AND INSTALL WATER SERVICES:P8E_PLM
  • INSTALL AND MAINTAIN DOMESTIC WATER TREATMENT EQUIPMENT:P8E_PLM

  • 08:05 am - 04:35 pm
    Week(s): 49
    December: 5

    Location:
  • E2.M10 (through w/shop)
  • Modules:
  • INSTALL STORMWATER AND SUB-SOIL DRAINAGE SYSTEMS:P8E_PLM
  • DRAIN WORK SITE:P8E_PLM
  • INSTALL PREFABRICATED INSPECTION OPENINGS AND ENCLOSURES:P8E_PLM
  • DESIGN DOMESTIC URBAN IRRIGATION SYSTEMS:P8E_PLM
  • SET OUT, INSTALL AND COMMISSION IRRIGATION SYSTEMS:P8E_PLM
  • INSTALL AND COMMISSION DOMESTIC IRRIGATION PUMPS:P8E_PLM
  • CONNECT IRRIGATION SYSTEMS FROM DRINKING WATER SUPPLY:P8E_PLM

  • 08:05 am - 04:35 pm
    Week(s): 31
    July: 33

    Location:
  • E2.M10 (through w/shop)
  • Modules:
  • WORK SAFELY AT HEIGHTS:P8E_PLM
  • OPERATE ELEVATED WORK PLATFORMS:P8E_PLM
  • WORK SAFELY ON ROOFS:P8E_PLM

  • 08:05 am - 04:35 pm
    Week(s): 35
    August: 30

    Location:
  • E2.M05 (through w/shop)
  • Modules:
  • FLASH PENETRATIONS THROUGH ROOFS AND WALLS:P8E_PLM
  • INSTALL AIR CONDITIONING CONTROL EQUIPMENT:P8E_PLM
  • INSTALL AND MAINTAIN EVAPORATIVE AIR COOLING SYSTEMS:P8E_PLM

  • 08:05 am - 04:35 pm
    Week(s): 41
    October: 11

    Location:
  • E2.M05 (through w/shop)
  • Modules:
  • ERECT AND DISMANTLE RESTRICTED HEIGHT SCAFFOLDING:P8E_PLM
  • CALCULATE AND INSTALL NATURAL VENTILATION FOR TYPE A GAS APPLIANCES:P8E_PLM
  • SIZE CONSUMER GAS PIPING SYSTEMS:P8E_PLM

  • 08:05 am - 04:35 pm
    Week(s): 45
    November: 8

    Location:
  • E2.M10 (through w/shop)
  • Modules:
  • WELD POLYETHYLENE AND POLYPROPYLENE PIPES USING FUSION METHOD:P8E_PLM
  • SET OUT AND INSTALL WATER SERVICES:P8E_PLM
  • INSTALL AND MAINTAIN DOMESTIC WATER TREATMENT EQUIPMENT:P8E_PLM

  • 08:05 am - 04:35 pm
    Week(s): 49
    December: 6

    Location:
  • E2.M10 (through w/shop)
  • Modules:
  • INSTALL STORMWATER AND SUB-SOIL DRAINAGE SYSTEMS:P8E_PLM
  • DRAIN WORK SITE:P8E_PLM
  • INSTALL PREFABRICATED INSPECTION OPENINGS AND ENCLOSURES:P8E_PLM
  • DESIGN DOMESTIC URBAN IRRIGATION SYSTEMS:P8E_PLM
  • SET OUT, INSTALL AND COMMISSION IRRIGATION SYSTEMS:P8E_PLM
  • INSTALL AND COMMISSION DOMESTIC IRRIGATION PUMPS:P8E_PLM
  • CONNECT IRRIGATION SYSTEMS FROM DRINKING WATER SUPPLY:P8E_PLM