Timetables

Box Hill Institute Timetables

Group: P8E_PLM_GRP
Friday, 06 Dec 2019 Week 49
Time Location - Modules
08:05 am - 04:35 pm
E2.M10 (through w/shop)
  • INSTALL STORMWATER AND SUB-SOIL DRAINAGE SYSTEMS:P8E_PLM
  • DRAIN WORK SITE:P8E_PLM
  • INSTALL PREFABRICATED INSPECTION OPENINGS AND ENCLOSURES:P8E_PLM
  • DESIGN DOMESTIC URBAN IRRIGATION SYSTEMS:P8E_PLM
  • SET OUT, INSTALL AND COMMISSION IRRIGATION SYSTEMS:P8E_PLM
  • INSTALL AND COMMISSION DOMESTIC IRRIGATION PUMPS:P8E_PLM
  • CONNECT IRRIGATION SYSTEMS FROM DRINKING WATER SUPPLY:P8E_PLM

  • Previous WeekDec 02 Mon
    Dec 03 Tue
    Dec 04 Wed
    Dec 05 Thu
    Dec 06 Fri
    Dec 07 Sat
    (No Classes)
    Dec 08 Sun
    (No Classes)
    Next Week